Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10201-10210 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211215 | Project ID: 211215 Permit Numbers: 0614NSN0398 | 06--- | 04/04/2019 | NOT VERIFIED | Details CEM-3701 Report | ||
| 211216 | Project ID: 211216 Permit Numbers: 1115NUJ0564 | 11-IMP-8-39.47/39.47 | enter upon State Highway right of way in Imperial County, City of El Centro, on Route 8, post mile R39.47, to install water pipeline by jack and bore, in accordance with the requirements and conditions contained herein and as further directed or approved by the State's Resident Engineer, Shawn R | INTERSTATE 8, EL CENTRO | 08/07/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 211217 | Project ID: 211217 DEA: 041A6704 | 04--- | 03/18/2025 | 1 (02/03/2020) | Details CEM-3701 Report | ||
| 211218 | Project ID: 211218 DEA: 031H4904 | 03-PLA-80-54.7, 54.7 | replace culvert, repair pavement | 08/06/2019 | 1 (10/19/2016) | Details CEM-3701 Report | |
| 211220 | Project ID: 211220 DEA: 031H4304 | 03-SAC-5-15.8/16.9 | repair poor drainage issues | 11/30/2017 | 1 (10/19/2016) | Details CEM-3701 Report | |
| 211221 | Project ID: 211221 DEA: 010A1004 EFIS: 0112000023 | 01-DN-101-VAR | BRIDGE SEISMIC RETROFIT AND CLEAN AND PAINT BRIDGE. | DEL NORTE COUNTY AT VARIOUS LOCATIONS | 10/30/2017 | 1 (03/28/2016) | Details CEM-3701 Report |
| 211222 | Project ID: 211222 DEA: 010A9904 EFIS: 0112000001 | 01-HUM-96-R6.2/6.6 | RECONSTRUCT & REALIGN ROADWAY, GRADING, AB, HMA, CULVERTS, GUARDRAIL | HUMBOLDT COUNTY 6.2 MILES EAST OF WILLOW CREEK TO 2.6 MILES WEST OF TISH-TANG CAMPGROUND | 11/27/2018 | 1 (09/27/2016) | Details CEM-3701 Report |
| 211223 | Project ID: 211223 DEA: 010B27U4 EFIS: 0115000111 | 01-DN-101-14.9/15.3 | CONSTRUCT RETAINING WALLS AND RECONSTRUCT ROADWAY | DEL NORTE COUNTY ABOUT 10 MILES NORTH OF KLAMATH FROM 2.2 MILES TO 2.6 MILES NORTH OF WILSON CREEK BRIDGE | 11/27/2018 | 1 (06/23/2016) | Details CEM-3701 Report |
| 211224 | Project ID: 211224 DEA: 010E4904 | 01-HUM-101-25.5/28.5 | RHMA OVERLAY, RUMBLE STRIPS, PAVEMENT DELINEATION. | 02/16/2017 | 1 (03/28/2016) | Details CEM-3701 Report | |
| 211225 | Project ID: 211225 DEA: 021H0204 | 02-TRI-36-R9.2/15.8 | PLACE HMA WITH REPLACE AC SURFACING | TRINITY COUNTY NEAR FOREST GLEN FROM 0.2 MILE WEST OF SOUTH FORK MOUNTAIN ROAD TO 0.9 MILE WEST OF GLEN CREEK ROAD | 08/03/2018 | 1 (03/31/2017) | Details CEM-3701 Report |
