Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 1011-1020 of 18763 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 210158 | Project ID: 210158 DEA: 100G4204 EFIS: 1014000038 COOP: 10437 | 10-STA-5-15.8/15.9 | Reconstruct the existing Interstate 5/Sperry Road Interchange | Stanislaus County | 2 (01/30/2015) | Details CEM-3701 Report | |
| 215241 | Project ID: 215241 DEA: 101J2404 EFIS: 1019000032 MINOR: 10A2170 | 10-STA-5-13.5/15.9 | ON I-5 From 0.8 MILE N OF SALADO Creek TO DEL PUERTO CANYON RD | Stanislaus County | 01/04/2023 | 1 (10/23/2020) | Details CEM-3701 Report |
| 994300 | Project ID: 994300 DEA: 101C4004 EFIS: 1017000025 | 10-STA,TUO-49,108,120-Var | REMOVE EXISTING GUARDRAIL AND INSTALL MIDWEST GUARDRAIL SYSTEM. | STANISLAUS AND TUOLUMNE COUNTIES AT VARIOUS LOCATIONS | 02/26/2024 | 1 (10/04/2022) | Details CEM-3701 Report |
| 5812 | Project ID: 5812 DEA: 100U0004 | 10-STA,SJ-99,132-M18.3/M18.7,5.8/7.1 | Repair failed areas on ramps and fog seal shoulders. | STANISLAUS AND SAN JOAQUIN COUNTIES ON ROUTE 99 FROM 0.2 MILE SOUTH OF CARPENTER/ BRIGGSMORE AVENUE OVERCROSSINGTO 0.2 MILE NORTH OF CARPENTER/ BRIGGSMORE AVENUE OVERCROSSING AND ON ROUTE 132FROM ROUTE 132/33 SEPARATION AND OVERHEAD TO STANISLAUS COUN | 04/08/2011 | 1 (06/03/2010) | Details CEM-3701 Report |
| 212697 | Project ID: 212697 DEA: 101C3004 EFIS: 1014000145 | 10-STA,SJ-99-R20.9/R24.7, 0.0/6.8 | RAMP WIDENING, DRAINAGE, RAMP METERS, AND FIBER OPTIC SYSTEM. | STANISLAUS AND SAN JOAQUIN COUNTIES FROM 0.8 MILE SOUTH OF PELANDALE AVENUE OVERCROSSING IN MODESTO TO 0.2 MILE NORTH OF THE NORTH JUNCTION ROUTE 120/99 SEPARATION IN MANTECA | 01/04/2021 | 1 (01/25/2018) | Details CEM-3701 Report |
| 211278 | Project ID: 211278 DEA: 101E0004 EFIS: 1015000060 | 10-STA,SJ-33-18.0/27.1,0.0/5.0 | RUBBERIZED HOT MIX ASPHALT RESURFACING. | STANISLAUS AND SAN JOAQUIN COUNTIES AT AND NEAR WESTLEY FROM ROGERS ROAD TO LEHMAN ROAD | 11/14/2016 | 1 (06/23/2016) | Details CEM-3701 Report |
| 214525 | Project ID: 214525 DEA: 100W6304 EFIS: 1012000021 | 10-STA,SJ-5-27.0/27.4,0.9 | REPLACE WASTEWATER SYSTEM. | STANISLAUS AND SAN JOAQUIN COUNTIES ABOUT 9 MILES NORTHWEST OF PATTERSON AT THE WESTLEY SAFETY ROADSIDE REST AREA AND ABOUT 0.9 MILE NORTH OF THE COUNTY LINE | 08/23/2023 | 1 (11/19/2019) | Details CEM-3701 Report |
| 212861 | Project ID: 212861 DEA: 101H2804 EFIS: 1017000190 | 10-STA-5-10.7/25.5 | BRIDGE DECK OVERLAY WITH POLYESTER CONCRETE, REPLACE APPROACH SLABS & JOINT SEALS IN STANISLAUS COUNTY ON STATE ROUTE 5 FROM FINK ROAD UC TO KHALSA ROAD UC. | STANISLAUS AND MERCED COUNTIES. | 1 (03/23/2020) | Details CEM-3701 Report | |
| 209953 | Project ID: 209953 DEA: 100X3204 EFIS: 1012000212 | 10-STA,MER-108,165-33.1/36.1,30.0/32.4, | COLD PLANE AC PAVEMENT AND CONSTRUCT RUMBLE STRIPS. | STANISLAUS AND MERCED COUNTIES ON ROUTE 108 FROM EIGHTH STREET TO CRANE ROAD AND ON ROUTE 165 FROM WESTSIDE BOULEVARD TO WILLIAMS AVENUE | 02/23/2016 | 1 (10/28/2014) | Details CEM-3701 Report |
| 1001846 | Project ID: 1001846 DEA: 044Q6504 EFIS: 0419000424 COOP: 043086 | 04-SCL-SCL-101-40.2/52.55 | REHABILITATE PAVEMENT AND UPGRADE CURB RAMPS TO AMERICANS WITH DISABILITIES ACT (ADA) STANDARDS IN AND NEAR THE CITIES OF SAN JOSE, SANTA CLARA, SUNNYVALE, MOUNTAIN VIEW, AND PALO ALTO. | STANDARDS IN AND NEAR THE CITIES OF SAN JOSE, SANTA CLARA, SUNNYVALE, MOUNTAIN VIEW, AND PALO ALTO, FROM 0.5 MILE SOUTH OF DE LA CRUZ BOULEVARD TO 0.4 MILE NORTH OF EMBARCADERO ROAD | NOT VERIFIED | Details CEM-3701 Report |
