Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10151-10160 of 19149 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 995004 | Project ID: 995004 DEA: 060U0004 EFIS: 0615000296 | 06-FRE,KER-33,58-70.6/76.0,27.8 | BRIDGE PREVENTIVE MAINTENANCE. | FRESNO AND KERN COUNTIES IN FIREBAUGH ON ROUTE 33 FROM POSO CANAL BRIDGE TO COLONY MAIN CANAL BRIDGE AND NEAR MCKITTRICK ON ROUTE 58 AT MAIN DRAIN CANAL BRIDGE | 05/09/2025 | 1 (07/27/2023) | Details CEM-3701 Report |
| 214733 | Project ID: 214733 DEA: 060R1104 EFIS: 0614000030 | 06-FRE,KER-119,198-Var | CULVERT REPLACEMENT. | FRESNO AND KERN COUNTIES AT VARIOUS LOCATIONS. | 04/21/2021 | 1 (03/02/2020) | Details CEM-3701 Report |
| 7056 | Project ID: 7056 DEA: 060N0704 EFIS: 0600020548 | 06-KER,KER-5-Var | CLEAN AND PAINT EXISTING BRIDGES. | FRESNO AND KERN COUNTIES AT VARIOUS LOCATIONS | 10/08/2014 | 1 (06/22/2012) | Details CEM-3701 Report |
| 215137 | Project ID: 215137 DEA: 061A6204 EFIS: 0621000026 | 06-FRE-33-24.8 | EMERGENCY CULVERT REPAIRS | FRESNO 33 | 05/16/2024 | 1 (09/01/2020) | Details CEM-3701 Report |
| 209902 | Project ID: 209902 DEA: 041G7004 EFIS: 0400020169 Permit Numbers: 0414NMC0687 04146DP1506 | 04-SF-80-5.5/5.5 | This project will re-construction the WB I-80 Fremont off-Ramp by Creating a tee -intersection with Fremont st. and eliminating the the current free flowing Fremont Street dual left- turns at the end of the off-ramp. | Fremont St., San Francisco | 08/22/2018 | 2 (10/09/2014) | Details CEM-3701 Report |
| 212618 | Project ID: 212618 DEA: 044G0564 EFIS: 0417000154 | 04-ALA-680-M2.4/M12.4 | ROADWAY REHAB, BRIDGE REPLACEMENT, RET. WALLS, TOLL SYSTEMS | FREMONT AND AT SUNOL FROM MISSION BOULEVARD SEPARATION TO KOOPMAN ROAD UNDERCROSSING | 12/08/2022 | 1 (10/16/2017) | Details CEM-3701 Report |
| 214482 | Project ID: 214482 DEA: 10403503 EFIS: 1000000424 COOP: 104075 | 10-STA-132-R11.3/R14.7 | SR 132 West, Freeway / Expressway Phase 1; The Project consists of 4 bridges and 5 retaining walls. Two of the retaining walls include sound walls as part of the development system. This project also includes roadway improvements, landscaping and utiliti. | freeway/express way at a new alignment along the adopted State Route 132 route south of Kansas Avenue from Dakota Avenue to east of SR 99 at the Needham Street Bridge Overcrossing | 03/04/2022 | 2 (10/14/2019) | Details CEM-3701 Report |
| 209807 | Project ID: 209807 Permit Numbers: 0813NSN0514 | 08-RIV-60-14.3/14.3 | Entering upon State Right of Way at SR-60 and Sunnymead Blvd., to install CCTV camera pole with a post top CCTV camera for traffic monitoring, install a 334-CCTV cabinet for communication equipment, provide electrical service via new breaker in existing service pedestal for adjacent traffic signal | Frederick Street/Pigeon Pass Road, Moreno Valley | 07/31/2018 | 1 (08/15/2014) | Details CEM-3701 Report |
| 3260 | Project ID: 3260 DEA: 060J4804 | 06-FRE-5-48.6/65.8 | PLACE RUBBERIZED HOT MIX ASPHALT | FRE county | 04/21/2011 | 1 (12/07/2009) | Details CEM-3701 Report |
| 993877 | Project ID: 993877 EFIS: 0000020505 Permit Numbers: 07216CD2109 | 07-LA-138-51.406 | Install a Right-Turn Pocket and new commercial driveway along south side of Fort Tejon, construct curb and gutter approximately 1,500' north of Pearblossom Blvd, Install an eastbound overlap phase to the existing traffic signal at the Fort Tejon and Pearblossom Boulevard intersection on CA-138 ( | FORT TEJON AND PEARBLOSSOM, PALMDALE | 07/14/2023 | 1 (10/06/2022) | Details CEM-3701 Report |