Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10091-10100 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 215411 | Project ID: 215411 DEA: 060X1904 EFIS: 0618000230 | 06-FRE,KIN-5,41,168,180,198-Var | PLACE POLYESTER CONCRETE OVERLAY, REPLACE JOINT SEALS AND TREAT DECK. | FRESNO AND KINGS COUNTIES AT VARIOUS LOCATIONS | 10/04/2022 | 1 (01/25/2021) | Details CEM-3701 Report |
| 993170 | Project ID: 993170 DEA: 060T0204 EFIS: 0615000005 | 06-FRE,KIN-5-Var | INSTALL VEHICLE DETECTION SYSTEMS. | FRESNO AND KINGS COUNTIES AT VARIOUS LOCATIONS | 08/16/2023 | 1 (08/11/2021) | Details CEM-3701 Report |
| 994820 | Project ID: 994820 DEA: 060V1104 EFIS: 0616000208 | 06-FRE,KIN-5,41,198-Var | STRATFORD KINGS RIVER BRIDGE REPLACEMENT. | FRESNO AND KINGS COUNTIES AT VARIOUS LOCATIONS | 05/09/2025 | 1 (09/20/2023) | Details CEM-3701 Report |
| 995004 | Project ID: 995004 DEA: 060U0004 EFIS: 0615000296 | 06-FRE,KER-33,58-70.6/76.0,27.8 | BRIDGE PREVENTIVE MAINTENANCE. | FRESNO AND KERN COUNTIES IN FIREBAUGH ON ROUTE 33 FROM POSO CANAL BRIDGE TO COLONY MAIN CANAL BRIDGE AND NEAR MCKITTRICK ON ROUTE 58 AT MAIN DRAIN CANAL BRIDGE | 05/09/2025 | 1 (07/27/2023) | Details CEM-3701 Report |
| 214733 | Project ID: 214733 DEA: 060R1104 EFIS: 0614000030 | 06-FRE,KER-119,198-Var | CULVERT REPLACEMENT. | FRESNO AND KERN COUNTIES AT VARIOUS LOCATIONS. | 04/21/2021 | 1 (03/02/2020) | Details CEM-3701 Report |
| 7056 | Project ID: 7056 DEA: 060N0704 EFIS: 0600020548 | 06-KER,KER-5-Var | CLEAN AND PAINT EXISTING BRIDGES. | FRESNO AND KERN COUNTIES AT VARIOUS LOCATIONS | 10/08/2014 | 1 (06/22/2012) | Details CEM-3701 Report |
| 215137 | Project ID: 215137 DEA: 061A6204 EFIS: 0621000026 | 06-FRE-33-24.8 | EMERGENCY CULVERT REPAIRS | FRESNO 33 | 05/16/2024 | 1 (09/01/2020) | Details CEM-3701 Report |
| 209902 | Project ID: 209902 DEA: 041G7004 EFIS: 0400020169 Permit Numbers: 0414NMC0687 04146DP1506 | 04-SF-80-5.5/5.5 | This project will re-construction the WB I-80 Fremont off-Ramp by Creating a tee -intersection with Fremont st. and eliminating the the current free flowing Fremont Street dual left- turns at the end of the off-ramp. | Fremont St., San Francisco | 08/22/2018 | 2 (10/09/2014) | Details CEM-3701 Report |
| 212618 | Project ID: 212618 DEA: 044G0564 EFIS: 0417000154 | 04-ALA-680-M2.4/M12.4 | ROADWAY REHAB, BRIDGE REPLACEMENT, RET. WALLS, TOLL SYSTEMS | FREMONT AND AT SUNOL FROM MISSION BOULEVARD SEPARATION TO KOOPMAN ROAD UNDERCROSSING | 12/08/2022 | 1 (10/16/2017) | Details CEM-3701 Report |
| 214482 | Project ID: 214482 DEA: 10403503 EFIS: 1000000424 COOP: 104075 | 10-STA-132-R11.3/R14.7 | SR 132 West, Freeway / Expressway Phase 1; The Project consists of 4 bridges and 5 retaining walls. Two of the retaining walls include sound walls as part of the development system. This project also includes roadway improvements, landscaping and utiliti. | freeway/express way at a new alignment along the adopted State Route 132 route south of Kansas Avenue from Dakota Avenue to east of SR 99 at the Needham Street Bridge Overcrossing | 03/04/2022 | 2 (10/14/2019) | Details CEM-3701 Report |
