Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10091-10100 of 19330 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 210469 | Project ID: 210469 DEA: 042J1504 EFIS: 0414000432 | 04-CC-4,80,580,680-Var | THE REPLACEMENT OF OVERHEAD SIGNS WITH HIGH-PERFORMANCE REFLECTIVE SIGNS, REMOVAL OF EXISTING SIGNAGE LIGHTING, AND REMOVAL OF GANTRY CATWALKS ON SIGN-GANTRY STRUCTURES, WITHIN VARIOUS COUNTIES | IN CONTRA COSTA COUNTY AT VARIOUS LOCATIONS | 12/21/2017 | 1 (03/20/2017) | Details CEM-3701 Report |
| 1811 | Project ID: 1811 DEA: 04150774 | 04-CC-4-1.1/50.1 | INSTALL CHANGEABLE MESSAGE SIGN | IN CONTRA COSTA COUNTY AT VARIOUS LOCATIONS FROM WILLOW AVENUEOVERCROSSING TO OAKLEY ROAD OVERCROSSING | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
| 2093 | Project ID: 2093 DEA: 04272124 | 04-CC-4-4 | RESURFACE ASPHALT CONCRETE | IN CONTRA COSTA COUNTY IN AND NEAROAKLEY AND BRENTWOOD FROM ROUTE 4 AND 160 SEPARATION TO SELLERS AVENUE | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
| 7045 | Project ID: 7045 DEA: 044S4904 EFIS: 0400001242 | 04-CC-4-12.4 | REGRADE EXISTING SLOPE, INSTALL PERMEABLE BLANKET, AND PAVE SLOPES | IN CONTRA COSTA COUNTY IN CONCORD AT PACHECO BOULEVARD UNDERCROSSING | 03/18/2025 | 2 (02/18/2020) | Details CEM-3701 Report |
| 2081 | Project ID: 2081 DEA: 04269604 | 04-CC-24-0.2/13.3 | HWY 24 REHAB PROJECT- REPLACE CONCRETE PAVEMENT (RAPID STRENGTH CONCRETE); STRUCTURAL CONCRETE (APPROACH SLAB); PAVING NOTCH EXTENSIONS | IN CONTRA COSTA COUNTY IN LAFAYETTE AND ORINDA FROM THE CALDECOTT TUNNEL TO EL CURTOLA ROAD OVERCROSSING | 04/20/2011 | NOT VERIFIED | Details CEM-3701 Report |
| 1330 | Project ID: 1330 DEA: 04006044 | 04-CC-680-24.6 | TOLL PLAZA CONSTRUCTION | IN CONTRA COSTA COUNTY IN MARTINEZ FROM MOCOCO OVERHEAD TO BENICIA MARTINEZ BRIDGE AND OVERHEAD | 11/15/2010 | 1 (11/15/2010) | Details CEM-3701 Report |
| 1641 | Project ID: 1641 DEA: 040C7204 | 04-CC-4-7.9/R27.1 | RESURFACE ASPHALT CONCRETE | IN CONTRA COSTA COUNTY IN MARTINEZAND CONCORD FROM CUMMINGS SKYWAYOVERCROSSING TO WILLOW PASS ROADUNDERCROSSING | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
| 3007 | Project ID: 3007 DEA: 06498304 Permit Numbers: 0606NSN0713 | 06-KER-65-.67 | WIDEN EXISTING ROADWAY; CONSTRUCTNEW TRAFFIC SIGNAL/sr 65/7th STREET -STADARD RD INTERSECTION | IN CONTRA COSTA COUNTY IN MARTINEZAND CONCORD FROM CUMMINGS SKYWAYOVERCROSSING TO WILLOW PASS ROADUNDERCROSSING | 05/24/2011 | 2 (12/05/2014) | Details CEM-3701 Report |
| 2208 | Project ID: 2208 DEA: 042S2204 | 04-CC-24-0.3 | CONSTRUCT SOIL NAIL WALL | IN CONTRA COSTA COUNTY IN ORINDA AT 0.5 KP WESTBOUND OF FISHRANCH ROAD OFF RAMP | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
| 2123 | Project ID: 2123 DEA: 042A0304 | 04-CC-80-3.4/3.8 | HIGHWAY PLANTING AND IRRIGATION SYSTEM | IN CONTRA COSTA COUNTY IN RICHMOND FROM SOLANO AVENUE OVERCROSSING TO MCBRYDE AVENUE OVERCROSSING | 12/16/2011 | 1 (07/05/2011) | Details CEM-3701 Report |
