Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 10051-10060 of 18775 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
210618Project ID: 210618
DEA: 06342534
EFIS: 0600000382
COOP: 061616A2
06-FRE-180-R74.1/R78.6CONSTRUCT SEGMENT 3 OF KINGS CANYON EXPRESSWAYFRESNO COUNTY ABOUT 8.4 MILES EAST OF FRESNO FROM 0.7 MILE WEST OF SMITH AVENUE TO 0.7 MILE EAST OF FRANKWOOD AVENUE07/06/20211 (07/10/2017)Details CEM-3701 Report
994930Project ID: 994930
DEA: 061A7504
EFIS: 0620000180
06-FRE-5-26.8/30.0CONSTRUCT HIGH-TENSION MEDIAN CABLE BARRIER WITH VEGETATION CONTROL.FRESNO COUNTY ABOUT 8 MILES WEST OF THREE ROCKS FROM PARKHURST EQUIPMENT UNDERCROSSING TO ROUTE 5/33 SEPARATION04/07/20251 (06/27/2023)Details CEM-3701 Report
3206Project ID: 3206
DEA: 060H0004
06-FRE-41-R1.0/R3.0COLD IN-PLACE RECYCLING AND HMA OVERLAY.FRESNO COUNTY ABOUT 8 MILES NORTH OF LEMOORE FROM LAGUNA AVENUE TO 0.04 MILE SOUTH OF HARLAN AVENUE08/25/20111 (11/04/2011)Details CEM-3701 Report
213793Project ID: 213793
DEA: 060W7004
EFIS: 0617000283
06-FRE-33-24.3/R29.0,R39.9/44.5COLD PLANE AC PAVEMENT, PLACE HMA RESURFACING.FRESNO COUNTY ABOUT 7.8 MILES NORTH OF COALINGA FROM NORTH JUNCTION ROUTE 198 TO SOUTH JUNCTION ROUTE 33/5 AND FROM 0.1 MILE NORTH OF NORTH JUNCTION ROUTE 33/5 TO EL PROGRESSIO ROAD08/20/20211 (01/09/2019)Details CEM-3701 Report
10016Project ID: 10016
DEA: 06342524
EFIS: 0600000381
06-FRE-180-R71.8/74.5NEW EXPRESS HIGHWAYFRESNO COUNTY ABOUT 6.3 MILES EAST OF FRESNO FROM 0.6 MILE WEST OF QUALITY AVENUE TO 0.2 MILE WEST OF SMITH AVENUE10/19/20201 (07/23/2013)Details CEM-3701 Report
215607Project ID: 215607
DEA: 061C6504
EFIS: 0621000099
06-FRE-41-R0.5/M5.9RESURFACE AC PAVEMENT AND INSTALL MEDIAN TYPE K CONCRETE BARRIER.FRESNO COUNTY ABOUT 6 MILES NORTH OF LEMOORE FROM 0.5 MILE NORTH OF EXCELSIOR AVENUE UNDERCROSSING TO 0.2 MILE SOUTH OF ELKHORN AVENUE05/04/20221 (03/29/2021)Details CEM-3701 Report
214643Project ID: 214643
DEA: 060Y0604
06-FRE-33,198-22.7/24.3,26.8/32.7COLD PLANE, HMA AND RHMA PAVING.FRESNO COUNTY ABOUT 6 MILES NORTH OF COALINGA ON ROUTE 33 FROM 0.9 MILE NORTH OF PALMER AVENUE TO ROUTE 33/198 NORTH JUNCTION AND ABOUT 12 MILES NORTH OF COALINGA ON ROUTE 198 FROM ROUTE 198/5 SEPARATION TO LAKE AVENUE10/15/20201 (01/31/2020)Details CEM-3701 Report
209915Project ID: 209915
DEA: 060Q2704
EFIS: 0613000050
06-FRE-5-48.8/53.0PLACE HOT MIX ASPHALT AND CONTINUOUSLY REINFORCED CONCRETE PAVEMENT.FRESNO COUNTY ABOUT 38 MILES SOUTH OF SANTA NELLA FROM 0.1 MILE SOUTH OF PANOCHE ROAD OVERCROSSING TO 0.2 MILE NORTH OF RUSSELL AVENUE OVERCROSSING.08/24/20181 (12/29/2014)Details CEM-3701 Report
994895Project ID: 994895
DEA: 060X2804
EFIS: 0618000049
06-FRE-5-60.1/66.2COLD PLANE EXISTING PAVEMENT AND RESURFACE WITH HMA AND RHMA.FRESNO COUNTY ABOUT 21 MILES WEST OF MENDOTA FROM SHIELDS AVENUE OVERCROSSING TO MERCED COUNTY LINE12/02/20251 (06/27/2023)Details CEM-3701 Report
211963Project ID: 211963
DEA: 060V9704
06-FRE-5-53.0/60.0COLD PLANE AND RUBBERIZED HOT MIX ASPHALT (BONDED WEARING COURSE).FRESNO COUNTY ABOUT 17 MILES WEST OF MENDOTA FROM 0.3 MILE NORTH OF RUSSELL AVENUE OVERCROSSING TO SHIELDS AVENUE OVERCROSSING07/31/20171 (07/31/2017)Details CEM-3701 Report