Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 10001-10010 of 19495 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 209717 | Project ID: 209717 DEA: 11404404 EFIS: 1100020352 | 11-IMP-78,111-R9.2/R14.0,23.5/23.8 | INSTALL SLOPE PAVING, HIGHWAY PLANTING AND IRRIGATION SYSTEMS. | IMPERIAL COUNTY IN AND NEAR BRAWLEY ON ROUTE 78 AT VARIOUS LOCATIONS FROM ROUTE 86 TO 0.1 MILE EAST OF BEST ROAD AND ON OLD ROUTE 111 FROM 0.2 MILE SOUTH TO 0.1 MILE NORTH OF ROUTE 78/111 SEPARATION | 08/16/2021 | 1 (10/29/2014) | Details CEM-3701 Report |
| 8223 | Project ID: 8223 DEA: 11275204 EFIS: 1100020349 | 11-IMP-98-21.8/31.3 | PLACE RUBBERIZED HOT MIX ASPHALT (GAP GRADED), MBGR AND CURB RAMPS. | IMPERIAL COUNTY IN AND NEAR CALEXICO FROM 0.2 MILE WEST OF WESTSIDE MAIN CANAL BRIDGE TO KLOKE ROAD | 07/24/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 1001058 | Project ID: 1001058 DEA: 112N2264 EFIS: 1124000122 | 11-IMP-98-30.0/R57.0 | PLACE RUMBLE STRIPS AND PAVEMENT DELINEATION. | IMPERIAL COUNTY IN AND NEAR CALEXICO FROM 2.3 MILES WEST OF ROUTE 111 TO EVAN HEWES HIGHWAY | 1 (06/03/2025) | Details CEM-3701 Report | |
| 209381 | Project ID: 209381 DEA: 112M6604 EFIS: 1113000110 | 11-IMP-60,215-32.3/39.6 | OVERLAY WITH HMA (TYPE A) AND APPLY ASPHALT RUBBER SEAL COAT. | IMPERIAL COUNTY IN AND NEAR CALEXICO FROM ROUTE 111 TO ROUTE 7 | 11/25/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 1001005 | Project ID: 1001005 DEA: 112N2304 EFIS: 1124000188 | 11-IMP-86-4.5/L8.5,20.4/R21.9 | MICRO-SURFACING, PAVEMENT MARKING, RUMBLE STRIP, AND SHOULDER BACKING. | IMPERIAL COUNTY IN AND NEAR EL CENTRO AND BRAWLEY FROM MCCABE ROAD TO IMPERIAL AVENUE AND FROM I STREET TO 0.3 MILE NORTH OF NEW RIVER BRIDGE | 1 (05/28/2025) | Details CEM-3701 Report | |
| 210548 | Project ID: 210548 DEA: 112M7804 EFIS: 1114000092 | 11-IMP-8-R28.0/R40.9 | COLD PLANE AC, PAVE WITH HMA, PLACE ASPHALT RUBBER BINDER SEAL COAT. | IMPERIAL COUNTY IN AND NEAR EL CENTRO FROM 0.5 MILES EAST OF WESTSIDE ROAD OVERCROSSING TO ROUTE 8/111 SEPARATION | 08/07/2018 | 1 (08/26/2015) | Details CEM-3701 Report |
| 210401 | Project ID: 210401 DEA: 112M7704 | 11-IMP-115-R8.5/21.2 | APPLY ASPHALT RUBBER BINDER SEAL COAT AND SLURRY SEAL. | IMPERIAL COUNTY IN AND NEAR HOLTVILLE FROM 0.2 MILE WEST OF BRIDENSTINE AVENUE TO EAST JUNCTION ROUTE 78 | 12/04/2015 | 1 (03/01/2016) | Details CEM-3701 Report |
| 993611 | Project ID: 993611 DEA: 112N1154 EFIS: 1121000144 | 11-IMP-115-R3.2/R8.8,9.5/21.2 | ASPHALT RUBBER BINDER CHIP SEAL, PAVEMENT MARKINGS & SHOULDER BACKING. | IMPERIAL COUNTY IN AND NEAR HOLTVILLE FROM ROUTE 115/8 SEPARATION TO TOWLAND ROAD AND FROM WEST JUNCTION EVAN HEWES HIGHWAY TO EAST JUNCTION ROUTE 78/115 | 05/02/2023 | 1 (03/07/2022) | Details CEM-3701 Report |
| 215590 | Project ID: 215590 DEA: 112N0414 EFIS: 1118000184 | 11-IMP-115-R8.8/L11.4 | COLD PLANE, PAVE WITH HMA, PLACE MICROSURFACING AND SHOULDER BACKING. | IMPERIAL COUNTY IN AND NEAR HOLTVILLE FROM TOWLAND ROAD TO WEST JUNCTION EVAN HEWES HIGHWAY. | 05/10/2022 | 1 (07/23/2021) | Details CEM-3701 Report |
| 209329 | Project ID: 209329 DEA: 112M5104 EFIS: 1100020425 | 11-IMP-86-11.3/20.6 | REPLACE AC, PLACE ASPHALT RUBBER SEAL COAT, COLD PLANE AND OVERLAY. | IMPERIAL COUNTY IN AND NEAR IMPERIAL AND BRAWLEY FROM 15TH STREET TO SOUTH JUNCTION ROUTE 78. | 12/04/2015 | 1 (01/05/2016) | Details CEM-3701 Report |
