Print Report | Back to Sample Detail

Sample Record for 2023-02-02-43

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 211183 DEA: 062HT014 EFIS: 0613000318 COOP: HSR1446 QA Service Level: 2
DIST-CO-RTE-PM: 06-FRE-145,99(var),180,41-various
Work Description: Construct crossings in Madera and Fresno for High Speed Rail project: SR 145, SR 99, SR 180, SR 41.
Location Description: Madera and Fresno Counties; HST crossings at SR 145, SR 99, SR 180, SR 41.
Contractor Name: TutorPerini-Zachry-Parsons JV (TPZP-JV)
Contractor Address: Unknown
Resident Engineer: Fernando De Alba Structure Rep.: Nathan Quiroz

Sample Information

DIME Sample ID: 2023-02-02-43
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - FFS - Skid Testing
Sample Organization Contact: (916) 227-7287
Type of Sample: Acceptance
Type of Material: Roadway/Bridge Surface
Sample Taken Date: 02/02/2023
Date that the sample was received by the laboratory/organization performing the testing: 02/02/2023
The quantity of what the sample constitutes: 66FT LONG
A brief description of the sample: BRIDGE DECK
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: CT

Material Information

Pavement Surface Type:
Type of Traffic Control Provided:
DIST-CO-RTE:
Direction of Travel:
Post Mile:
Lanes to be Tested:
Station:

Test Results

Test 1 of 2

DIME Test ID: 2023-02-02-43-1
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 03/06/2023
Date Tested: 02/02/2023
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.45

Test 2 of 2

DIME Test ID: 2023-02-02-43-2
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 03/06/2023
Date Tested: 02/02/2023
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Pavement or Bridge Deck? Bridge Deck
Average Coefficient of Friction 0.42