Print Report | Back to Sample Detail

Sample Record for 2022-06-22-18

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 993241 DEA: 101F7604 EFIS: 1017000024 QA Service Level: 1
DIST-CO-RTE-PM: 10-SJ-12-R4.4
Work Description: REPLACE BRIDGE BEARING PADS.
Location Description: SAN JOAQUIN COUNTY IN TERMINOUS AT LITTLE POTATO SLOUGH BRIDGE
Contractor Name: CALIFORNIA ENGINEERING CONTRACTORS, INC.
Contractor Address: 20 Happy Valley Rd., Pleasanton, CA 94566
Resident Engineer: Troy Scheiber Structure Rep.: Daniel Laureno

Sample Information

DIME Sample ID: 2022-06-22-18
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 06/22/2022
Date that the sample was received by the laboratory/organization performing the testing: 06/23/2022
The quantity of what the sample constitutes: 150 Couplers
A brief description of the sample: Bar Lock Couplers
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: CEC

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: CMC
Coupler Manufacturer: Dayton Superior
Intermediate Assembler or Fabricator:
Rebar Size: #5
Coupler Model: Bar-Lock
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator:
Coupler Component Heat/Lot Number(s): MM20102408
Rebar Heat Number(s): 6031479
Rebar Size 2 :
Coupler Unique ID:

Test Results

Test 1 of 3

DIME Test ID: 2022-06-22-18-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 06/27/2022
Date Tested: 06/27/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: service splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
1No. 5/16mm1-0.00240.3132300104194service splicespaine
UTM 400kip
Temperature 72.00 f
Halo ID Small

Test 2 of 3

DIME Test ID: 2022-06-22-18-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 06/27/2022
Date Tested: 06/27/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: service splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
2No. 5/16mm100.3132506104858service splicespaine
UTM 400kip
Temperature 72.00 f
Halo ID

Test 3 of 3

DIME Test ID: 2022-06-22-18-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 06/27/2022
Date Tested: 06/27/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: service splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
3No. 5/16mm100.3132384104464service splicespaine
UTM 400kip
Temperature 72.00 f
Halo ID