Project Information

Project IdentifiersProject ID: 993241
DEA: 101F7604
EFIS: 1017000024
DIST-CO-RTE-PM10-SJ-12-R4.4
Award Date11/05/2021
Closeout Date05/10/2023
Work DescriptionREPLACE BRIDGE BEARING PADS.
Location DescriptionSAN JOAQUIN COUNTY IN TERMINOUS AT LITTLE POTATO SLOUGH BRIDGE
QA Service Level1 (Verified on 09/27/2021)

Sample Information

Sample Taken Date06/22/2022 Sample Unique Key18
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/23/2022
Sample typeQuality Assurance A brief description of the sampleBar Lock Couplers
The quantity of what the sample constitutes150 Couplers From where was the sample collectedJob Site
First name of sampler or witnessed byD Last name of sampler or witnessed byLaureno
Title of samplerSR Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCEC Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateService Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC
Coupler ManufacturerDayton Superior Intermediate Assembler or Fabricator
Rebar Size#5 Coupler ModelBar-Lock
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)MM20102408 Rebar Heat Number(s)6031479
Rebar Size 2 Coupler Unique IDNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2022-06-22-18-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)spaine, CT HQ - Sacramento Structural Materials Testing Laboratory06/27/2022spaine
Yes
06/27/2022service splice
2022-06-22-18-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)spaine, CT HQ - Sacramento Structural Materials Testing Laboratory06/27/2022spaine
Yes
06/27/2022service splice
2022-06-22-18-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)spaine, CT HQ - Sacramento Structural Materials Testing Laboratory06/27/2022spaine
Yes
06/27/2022service splice

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2022-06-22-18-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2022-06-22-18-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2022-06-22-18-3 CTM 670-December 2013 (Verified)