Print Report | Back to Sample Detail

Sample Record for 2018-05-17-13

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 209695 DEA: 08347704 EFIS: 0800000616 QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-SR-58-0/12.9
Work Description: (Alternative Delivery) The CMGC project will upgrade SR 58 from 2- to 4-lanes in San Bernardino County from the Kern County line to 7.5 miles east of US-395.
Location Description: SR-58 / 395 Kramer Junction project. In San Bernardino County from the Kern County line to 7.5 miles east of US-395.
Contractor Name: KIEWIT INFRASTRUCTURE WEST CO.
Contractor Address: 2215 E 1ST STREET, VANCOUVER, WA 98661
Resident Engineer: Shaine Shahidi Structure Rep.: Osama Abdalla

Sample Information

DIME Sample ID: 2018-05-17-13
TL Number from the TL Form: C952777
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 05/17/2018
Date that the sample was received by the laboratory/organization performing the testing: 05/23/2018
The quantity of what the sample constitutes: 450
A brief description of the sample: size 8 flashwelded hoop
From where was the sample collected: Fabricator
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: RKR Steel Welding

Material Information

Production or Authorization Testing: Authorization Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 65027876
Hoop Manufacturer Lot Number(s): 7
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: 8
Diameter of Hoop: 5'-8"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: GERDAUE
Welding Company: RKR Steel Welding
Coating Standards: Uncoated
Weld Type: Flash Welded

Test Results

Test 1 of 4

DIME Test ID: 2018-05-17-13-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 05/23/2018
Date Tested: 05/23/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke in Weld
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
17#8/25mm0.7979400100510Bar Broke in WeldFred
UTM 400KIP
Temperature 72 F

Test 2 of 4

DIME Test ID: 2018-05-17-13-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 05/23/2018
Date Tested: 05/23/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
27#8/25mm0.797621096470Bar BrokeFred
UTM 400KIP
Temperature 72 F

Test 3 of 4

DIME Test ID: 2018-05-17-13-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 05/23/2018
Date Tested: 05/23/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
37#8/25mm0.797666097040Bar BrokeFred
UTM 400KIP
Temperature 72 F

Test 4 of 4

DIME Test ID: 2018-05-17-13-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 05/23/2018
Date Tested: 05/23/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
47#8/25mm0.797643096750Bar BrokeFred
UTM 400KIP
Temperature 72 F