Sample Record for 2017-12-28-1

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 211848 DEA: 112T2174 EFIS: 1116000131 QA Service Level: 1
DIST-CO-RTE-PM: 11-SD-5-R37.4 - R46.5
Work Description: (Alternative Delivery) CMGC, San Elijo Highway Bridge Replacement. Replace the San Elijo lagoon highway bridge, construct HOV lanes, construct bike and pedestrian trails and bridge, build multi-use facility at Manchester Ave.
Location Description: IN SAN DIEGO COUNTY IN SOLANA BEACH AND ENCINITAS FROM 0.1 MILE NORTH OF LOMAS SANTA FE DRIVE OVERCROSSING TO 0.2 MILE SOUTH OF BIRMINGHAM DRIVE OVERCROSSING
Contractor Name: Flatiron-Skanska-Stacy and Witbeck, a Joint Venture
Contractor Address: 1770 La Costa Meadows Drive, San Marcos, CA 92078
Resident Engineer: Steve McMillan Structure Rep.: Phong Le

Sample Information

DIME Sample ID: 2017-12-28-1
TL Number from the TL Form: Unknown
Sample Submitted By Organization: CT - Unassigned/General Field Laboratory
Sample Organization Contact: 5625005861
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 12/28/2017
Date that the sample was received by the laboratory/organization performing the testing: 12/29/2017
The quantity of what the sample constitutes: 12
A brief description of the sample: QA samples
From where was the sample collected: Fabricator
Laboratory sample identification: unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: TNT Rebar

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 65028912-02
Hoop Manufacturer Lot Number(s): 1,4 and 10
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: 7
Diameter of Hoop: 5'-5"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: Gerdau
Welding Company: TNT Rebar
Coating Standards: Uncoated
Weld Type: Flash Welded

Test Results

Test 1 of 12

DIME Test ID: 2017-12-28-1-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 01/04/2018
Date Tested: 01/03/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
11#7/22mm0.666270110450Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 2 of 12

DIME Test ID: 2017-12-28-1-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 01/04/2018
Date Tested: 01/03/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
21#7/22mm0.666510110850Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 3 of 12

DIME Test ID: 2017-12-28-1-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 01/04/2018
Date Tested: 01/03/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke at Weld
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
31#7/22mm0.666400110670Bar Broke at WeldBrian
UTM 400KIP
Temperature 72 F

Test 4 of 12

DIME Test ID: 2017-12-28-1-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 01/04/2018
Date Tested: 01/03/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
41#7/22mm0.666390110650Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 5 of 12

DIME Test ID: 2017-12-28-1-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 01/04/2018
Date Tested: 01/03/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke at Weld
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
14#7/22mm0.65978099630Bar Broke at WeldBrian
UTM 400KIP
Temperature 72 F

Test 6 of 12

DIME Test ID: 2017-12-28-1-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 01/04/2018
Date Tested: 01/03/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
24#7/22mm0.661510102520Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 7 of 12

DIME Test ID: 2017-12-28-1-7
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 01/04/2018
Date Tested: 01/03/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
34#7/22mm0.660710101180Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 8 of 12

DIME Test ID: 2017-12-28-1-8
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 01/04/2018
Date Tested: 01/03/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
44#7/22mm0.661470102450Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 9 of 12

DIME Test ID: 2017-12-28-1-9
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 01/04/2018
Date Tested: 01/03/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke at Weld
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
110#7/22mm0.660280100470Bar Broke at WeldBrian
UTM 400KIP
Temperature 72 F

Test 10 of 12

DIME Test ID: 2017-12-28-1-10
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 01/04/2018
Date Tested: 01/03/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
210#7/22mm0.660830101380Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 11 of 12

DIME Test ID: 2017-12-28-1-11
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 01/04/2018
Date Tested: 01/03/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
310#7/22mm0.65928098800Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 12 of 12

DIME Test ID: 2017-12-28-1-12
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 01/04/2018
Date Tested: 01/03/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
410#7/22mm0.65910098500Bar BrokeBrian
UTM 400KIP
Temperature 72 F