Project Information

Project ID: 212143 DEA: 101F1604 EFIS: 1016000107 QA Service Level: 1
DIST-CO-RTE-PM: 10-MER-33,5-R16.6
Work Description: BRIDGE REPAIR
Location Description: MERCED COUNTY IN SANTA NELLA AT ROUTE 33/5 SEPARATION
Contractor Name: VIKING CONSTRUCTION COMPANY, INC.
Contractor Address: 11315 Sunrise Gold Circle, Suite A, Rancho Cordova, CA 95742
Resident Engineer: Muhammad Rahman Structure Rep.: George Samuel

Sample Information

DIME Sample ID: 2017-10-24-4
TL Number from the TL Form: C06001468
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 10/24/2017
Date that the sample was received by the laboratory/organization performing the testing: 10/24/2017
The quantity of what the sample constitutes: 8
A brief description of the sample: 4, 5 couplers
From where was the sample collected: Job Site
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Harris rebar Dayton

Material Information

Production or Authorization Testing: Authorization Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: Nucor
Coupler Manufacturer: Dayton Superior
Intermediate Assembler or Fabricator: Unknown
Rebar Size: 4, 5
Coupler Model: Bar-Lock
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter: Unknown
Rebar Hoop Fabricator: Unknown
Coupler Component Heat/Lot Number(s): A150277, 74100793
Rebar Heat Number(s): SE16104201, SE16103896
Rebar Size 2 :
Coupler Unique ID:

Test Results

Test 1 of 6

DIME Test ID: 2017-10-24-4-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 10/26/2017
Date Tested: 10/26/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
11#4/13mm0.2-0.0011941297060Service SpliceFred
Temperature 72 F
UTM 75KIP
Halo ID Small

Test 2 of 6

DIME Test ID: 2017-10-24-4-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 10/26/2017
Date Tested: 10/26/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
21#4/13mm0.201974098700Service SpliceFred
Temperature 72 F
UTM 75KIP
Halo ID Small

Test 3 of 6

DIME Test ID: 2017-10-24-4-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 10/26/2017
Date Tested: 10/26/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
31#4/13mm0.201940997045Service SpliceFred
Temperature 72 F
UTM 75KIP
Halo ID Small

Test 4 of 6

DIME Test ID: 2017-10-24-4-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 10/26/2017
Date Tested: 10/26/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
11#5/16mm0.310.00462884493045Service SpliceFred
Temperature 72 F
UTM 75KIP
Halo ID Small

Test 5 of 6

DIME Test ID: 2017-10-24-4-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 10/26/2017
Date Tested: 10/26/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
21#5/16mm0.3102886893123Service SpliceFred
Temperature 72 F
UTM 75KIP
Halo ID Small

Test 6 of 6

DIME Test ID: 2017-10-24-4-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 10/26/2017
Date Tested: 10/26/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
31#5/16mm0.3102893493335Service SpliceFred
Temperature 72 F
UTM 75KIP
Halo ID Small