Sample Record for 2024-01-16-42
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 994191 DEA: 081G8304 EFIS: 0816000079
QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-40-R100.8/R101.8
Work Description: HMA, STRUCTURAL CONC, BAR REINFORCING STEEL, CRSP & IMPORTED BORROW.
Location Description: SAN BERNARDINO COUNTY AT ESSEX FROM 1.1 MILES EAST OF ESSEX ROAD OVERCROSSING TO 0.5 MILE EAST OF HALFWAY HILLS WASH BRIDGE
Contractor Name: SKANSKA USA CIVIL WEST CALIFORNIA DISTRICT INC.
Contractor Address: 1995 Agua Mansa Rd, Riverside, CA 92509
Resident Engineer: Anthony Doan Structure Rep.: Jegbefume Adodo
Sample Information
DIME Sample ID: 2024-01-16-42
TL Number from the TL Form:
Sample Submitted By Organization: Skanska USA Civil
Sample Organization Contact: (951) 204-2981
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 01/16/2024
Date that the sample was received by the laboratory/organization performing the testing: 01/29/2024
The quantity of what the sample constitutes: 4
A brief description of the sample: HRC Coupler 500/510
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Camblin Steel Service
Material Information
Production or Authorization Testing: Authorization Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: Vinton Steel
Coupler Manufacturer: Vinton Steel
Intermediate Assembler or Fabricator:
Rebar Size: #9
Coupler Model: HRC 500-510
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator:
Coupler Component Heat/Lot Number(s): Heat 73131267 73131301 Lot 1
Rebar Heat Number(s): 2311607
Rebar Size 2 :
Coupler Unique ID: TF-17-01
Test Results
Test 1 of 4
DIME Test ID: 2024-01-16-42-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 01/31/2024
Date Tested: 01/30/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | | No. 9/29mm | 1 | -0.023 | 1 | 102439 | 102439 | Service Splice | aauvinen |
| |
UTM
|
400kip
|
Temperature
|
72.00 f
|
Halo ID
|
Small
|
Test 2 of 4
DIME Test ID: 2024-01-16-42-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 01/31/2024
Date Tested: 01/30/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | | No. 9/29mm | 1 | 0 | 1 | 102777 | 102777 | Service Splice | aauvinen |
| |
UTM
|
400kip
|
Temperature
|
72.00 f
|
Halo ID
|
|
Test 3 of 4
DIME Test ID: 2024-01-16-42-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 01/31/2024
Date Tested: 01/30/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | | No. 9/29mm | 1 | 0 | 1 | 102713 | 102713 | Service Splice | aauvinen |
| |
UTM
|
400kip
|
Temperature
|
72.00 f
|
Halo ID
|
|
Test 4 of 4
DIME Test ID: 2024-01-16-42-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 01/31/2024
Date Tested: 01/30/2024
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 4 | | No. 9/29mm | 1 | 0 | 1 | 102615 | 102615 | Service Splice | aauvinen |
| |
UTM
|
400kip
|
Temperature
|
72.00 f
|
Halo ID
|
|