Print Report | Back to Sample Detail

Sample Record for 2023-09-09-14

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 993664 DEA: 073311U4 EFIS: 0719000098 QA Service Level: 1
DIST-CO-RTE-PM: 07-VEN-23,101-R3.3/R3.7,0.2/40.8
Work Description: CONSTRUCT GUARDRAILS AND CONCRETE BARRIER.
Location Description: VENTURA COUNTY IN THOUSAND OAKS, CAMARILLO, OXNARD AND VENTURA ON ROUTE 101 FROM THE LOS ANGELES /VENTURA COUNTY LINE TO OLD PACIFIC COAST HIGHWAY AND ON ROUTE 23 FROM ROUTE 23/101 SEPARATION TO HILLCREST DRIVE
Contractor Name: Peterson Chase General Engineering
Contractor Address: 16351 Construction Circle West, Irvine, CA 92606
Resident Engineer: Alfred Ira Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2023-09-09-14
TL Number from the TL Form:
Sample Submitted By Organization: Alta Vista Solutions - Whittier
Sample Organization Contact: (510) 542-9827
Type of Sample: Quality Assurance
Type of Material: Aggregate
Sample Taken Date: 09/09/2023
Date that the sample was received by the laboratory/organization performing the testing: 09/09/2023
The quantity of what the sample constitutes: 1190 sqft
A brief description of the sample: Class 2 Aggregate Base
From where was the sample collected: Source
Laboratory sample identification: 23-1379
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: n/a

Material Information

Source Identification (SMARA, name of Pit or Job Site): n/a
The fabricator's/manufacturer's product name for the sample:
The fabricator/manufacturer designation for the sample:
The plant number:
A detailed description of where the material sample was collected: CTM 231 Test Holes
Where the material sample would have been placed if not sampled:
Primary Aggregate Nominal Size: 3/8 inch
The concrete mix design number:
Lot number:
Sublot number:
Aggregate Mix Number:

Test Results

Test

DIME Test ID: 2023-09-09-14-1
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Verified Date: 09/26/2023
Date Tested: 09/09/2023
Submitted By Organization: Alta Vista Solutions - Whittier
Organization Address: 12409 Slauson Avenue, Suite I,
Organization City: Whittier
Organization State: CA
Organization Zipcode: 90606
Organization Email: nicholas.hoffmann@oneatlas.com
Organization Phone: (510) 542-9827
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Standard Count Density 3026
Count or Density 1 2341
Count or Density 2 2451
Count or Density 3 2632
Standard Count Moisture 1073
Moisture Count 1 300
Moisture Count 2 280
Moisture Count 3 282
Sum of Count or Density 7424
Average of Count or Density 2475
Sum of Moisture Count 862
Average of Moisture Count 287
Count Ratio Density 0.82
Count Ratio Moisture 0.27
Calculated Percent Relative Compaction 95.5 %
Reported Percent Relative Compaction 96 %

Test

DIME Test ID: 2023-09-09-14-2
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Verified Date: 09/26/2023
Date Tested: 09/09/2023
Submitted By Organization: Alta Vista Solutions - Whittier
Organization Address: 12409 Slauson Avenue, Suite I,
Organization City: Whittier
Organization State: CA
Organization Zipcode: 90606
Organization Email: nicholas.hoffmann@oneatlas.com
Organization Phone: (510) 542-9827
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Is oversize material No
In-place wet density 2.11
Highest adjust wet density 2.21
Relative compaction 95
% Moisture 10.5 %
Optimum Moisture 12 %