Print Report | Back to Sample Detail

Sample Record for 2023-06-29-1

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 214956 DEA: 042K1704 EFIS: 0416000378 QA Service Level: 1
DIST-CO-RTE-PM: 04-ALA-880,880-15.6/26.5
Work Description: CONSTRUCT PVMT, JT SEAL, BARRIER, CL RAILING AND BRIDGE REMOVAL.
Location Description: ALAMEDA COUNTY AT VARIOUS LOCATIONS
Contractor Name: Ghilotti Construction Company (Jack Wu & Nishit Prajapati)
Contractor Address: 2975 Scott Blvd., Santa Clara, CA 95054
Resident Engineer: Rodelio Baluyot Structure Rep.: Bettie C. "Betty" Geng

Sample Information

DIME Sample ID: 2023-06-29-1
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - QASI Bay Area Field Office
Sample Organization Contact: (916) 284-6784
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 06/29/2023
Date that the sample was received by the laboratory/organization performing the testing: 06/29/2023
The quantity of what the sample constitutes: 4 lots
A brief description of the sample: Bar-Lock Standard Couplers
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: C&N Reinforcing

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: CMC
Coupler Manufacturer: Dayton Superior
Intermediate Assembler or Fabricator:
Rebar Size: #4
Coupler Model: Bar-Lock L Series D250L
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator:
Coupler Component Heat/Lot Number(s): 192435
Rebar Heat Number(s): 4129224
Rebar Size 2 :
Coupler Unique ID: SL-17-06

Test Results

Test 1 of 3

DIME Test ID: 2023-06-29-1-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 06/30/2023
Date Tested: 06/30/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
1No. 4/13mm10.00160.220128100641Service Spliceaauvinen
UTM 400kip
Temperature 72.00 f
Halo ID Small

Test 2 of 3

DIME Test ID: 2023-06-29-1-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 06/30/2023
Date Tested: 06/30/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
2No. 4/13mm100.220513102566Service Spliceaauvinen
UTM 400kip
Temperature 72.00 f
Halo ID

Test 3 of 3

DIME Test ID: 2023-06-29-1-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 06/30/2023
Date Tested: 06/30/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
3No. 4/13mm100.220217101087Service Spliceaauvinen
UTM 400kip
Temperature 72.00 f
Halo ID