Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 66667 DEA: JMFPP EFIS: 0019000043
QA Service Level:
DIST-CO-RTE-PM: 59---
Work Description: Special project for submitting Sample information for JMF Prequalification Program.
Location Description:
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Unknown Structure Rep.: Unknown
DIME Sample ID: 2020-05-14-16
TL Number from the TL Form:
Sample Submitted By Organization: Vulcan Materials Company - Pleasanton
Sample Organization Contact: (925) 260-3017
Type of Sample: Quality Control
Type of Material: Reclaimed Asphalt Pavement
Sample Taken Date: 05/14/2020
Date that the sample was received by the laboratory/organization performing the testing: 05/14/2020
The quantity of what the sample constitutes: 1
A brief description of the sample: RAP - Chem 1
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Vulcan Materials
RAP Source: Vulcan Materials
Aggregate Size: Unknown
Aggregate Source: Unknown
RAP Stockpile:
Stockpile Size (tons): Unknown
Reclaimed Asphalt Pavement Mix Number:
DIME Test ID: 2020-05-14-16-2
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Verified Date: 05/16/2020
Date Tested: 05/14/2020
Submitted By Organization: Vulcan Materials Company - Pleasanton
Organization Address: 52 El Charro Road,
Organization City: Pleasanton
Organization State: CA
Organization Zipcode: 94588
Organization Email: ruedid@vmcmail.com
Organization Phone: (925) 260-3017
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Is an aggregate correction factor used?
|
No
|
Cumulative percent passing the 2 in. sieve
|
100 %
|
Cumulative percent passing the 1 1/2 in. sieve
|
100 %
|
Cumulative percent passing the 1 in. sieve
|
100 %
|
Cumulative percent passing the 3/4 in. sieve
|
100 %
|
Cumulative percent passing the 1/2 in. sieve
|
100 %
|
Cumulative percent passing the 3/8 in. sieve
|
100 %
|
Cumulative percent passing the 1/4 in. sieve
|
100 %
|
Cumulative percent passing the #4 sieve
|
83.5 %
|
Cumulative percent passing the #8 sieve
|
63.4 %
|
Cumulative percent passing the #16 sieve
|
46.2 %
|
Cumulative percent passing the #30 sieve
|
34.4 %
|
Cumulative percent passing the #50 sieve
|
24.7 %
|
Cumulative percent passing the #100 sieve
|
17.1 %
|
Cumulative percent passing the #200 sieve
|
12.2 %
|
DIME Test ID: 2020-05-14-16-3
Test Method: AASHTO T164-14: Standard Method of Test for Quantitative Extraction of Asphalt Binder from Hot Mix Asphalt (HMA) (Asphalt Binder Content)
Verified Date: 05/16/2020
Date Tested: 05/14/2020
Submitted By Organization: Vulcan Materials Company - Pleasanton
Organization Address: 52 El Charro Road,
Organization City: Pleasanton
Organization State: CA
Organization Zipcode: 94588
Organization Email: ruedid@vmcmail.com
Organization Phone: (925) 260-3017
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Corrected Asphalt Binder Content
|
4.48 %
|