Summary for Test 2020-10-20-17-5

Test performed: CTM 518-June 2010

Project Information

Project IdentifiersProject ID: 213707
DEA: 081C38U4
EFIS: 0817000196
DIST-CO-RTE-PM08-RIV-10-6.7/R25.1
Award Date11/26/2019
Closeout Date11/01/2023
Work DescriptionRemove concrete pavement and base, and place HMA and JPCP
Location DescriptionROUTE 10/60 SEPARATION IN BEAUMONT TO ROUTE 10/111 SEPARATION NEAR CABAZON.
QA Service Level1 (Verified on 01/09/2020)

Sample Information

Sample Taken Date10/20/2020 Sample Unique Key17
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/21/2020
Sample typeQuality Assurance A brief description of the sampleJPCP beams
The quantity of what the sample constitutes4 Beams From where was the sample collectedJob Site
First name of sampler or witnessed byQC Last name of sampler or witnessed byQC
Title of sampler Telephone number of sampler
Laboratory sample identification1JA1, 1JA2, 1JB1, 1JB2 Linked DIME Sample ID
The fabricator/manufacturer/facility nameCoffman Specialties, Inc Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design number1906-2 R3
The truck number from where the sample was collectedUnknown The batch plant ticket number from where the sample was collectedtt
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleUnknown
A detailed description of where the material sample was collectedDischarge from concrete truck into wheelbarrow Where the material sample would have been placed if not sampledUnknown
From Lot No.Unknown Bag Lot No.Unknown

Test Details

DIME Sample ID: 2020-10-20-17
DIME Test ID: 2020-10-20-17-5
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete
Test Release Date: 2020-11-18

Test Results


Input Type: Calculated
Tester's full name: E. Jabbour, J. Le Roy
Date of test: 10/20/2020
Unit weight of the concrete: 143.8 lb/ft^3
Cement content: 600 lb/yd^3
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 11/18/2020