Summary for Test 2020-07-21-6-5
Test performed: CTM 551-August 2012Project Information
Project Identifiers | Project ID: 214687 DEA: 031G4904 EFIS: 0318000241 |
---|---|
DIST-CO-RTE-PM | 03-ED,PLA,SAC,YOL-49,50,80-Var |
Award Date | 04/02/2020 |
Closeout Date | 03/16/2021 |
Work Description | REPLACE JOINT SEALS AND PLACE POLYESTER CONCRETE OVERLAY. |
Location Description | EL DORADO, PLACER, SACRAMENTO, AND YOLO COUNTIES AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 03/24/2020) |
Sample Information
Sample Taken Date | 07/21/2020 | Sample Unique Key | 6 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/21/2020 |
Sample type | Quality Control | A brief description of the sample | 1 gallon can |
The quantity of what the sample constitutes | 2 tankers | From where was the sample collected | Source |
First name of sampler or witnessed by | Daniel | Last name of sampler or witnessed by | Tikusis |
Title of sampler | Technical Director | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Kwik Bond Polymers and Reichhold | Transportation Laboratory (TL) Number | Sacramento Caltrans lab |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Polyester | Mfg. Lot Number(s) | 1265454 |
---|---|---|---|
Batch number | 1265454 | Mix number | 1265454 |
Test Details
DIME Sample ID: 2020-07-21-6
DIME Test ID: 2020-07-21-6-5
Testing Lab: CT HQ - Sacramento Concrete Testing Laboratory
Test Method: CTM 551-August 2012: Method of Test for Determining Suitability of Materials for Overlayment and Repair of Portland Cement Concrete Pavements and Structures
Test Release Date: 2020-10-19
Test Results
Input Type: Calculated
Tester's full name: Vendor Results
Date of test: 10/19/2020
Curing history for Sample 1: 24hr
Maximum applied load (P) for Sample 1: 1520 lb
Span length for Sample 1: 9 in
Break location for Sample 1: bond
Specimen defects/notes for Sample 1: no data
Surface type for Sample 1: SSD
Modulus of rupture (R) for Sample 1: 760 psi
Curing history for Sample 2: 24hr
Maximum applied load (P) for Sample 2: 1340 lb
Span length for Sample 2: 9 in
Break location for Sample 2: bond
Specimen defects/notes for Sample 2: no data
Surface type for Sample 2: SSD
Modulus of rupture (R) for Sample 2: 670 psi
Curing history for Sample 3: 24hr
Maximum applied load (P) for Sample 3: 1648 lb
Span length for Sample 3: 9 in
Break location for Sample 3: bond
Specimen defects/notes for Sample 3: no data
Surface type for Sample 3: SSD
Modulus of rupture (R) for Sample 3: 824 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/19/2020 ✔