Summary for Test 2020-09-25-23-1

Test performed: AASHTO T240-17
Warning: The test results shown on this page have been superseded and are invalid. This information is for reference only.

Project Information

Project IdentifiersProject ID: 214588
DEA: 020J1504
EFIS: 0219000066
DIST-CO-RTE-PM02-SHA,TEH-36-4.0/8.0,13.0/17.0
Award Date02/20/2020
Closeout Date01/05/2021
Work DescriptionPLACE HMA (TYPE A), REPLACE AC SURFACING AND GUARDRAIL.
Location DescriptionSHASTA AND TEHAMA COUNTIES NEAR PLATINA FROM 0.3 MILE EAST OF HARRISON GULCH ROAD TO 0.8 MILE WEST OF PLATINA ROAD AND FROM 2.6 MILES EAST OF DRY CREEK BRIDGE TO 2.1 MILES WEST OF SALT CREEK BRIDGE
QA Service Level1 (Verified on 01/22/2020)

Sample Information

Sample Taken Date09/25/2020 Sample Unique Key23
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/09/2020
Sample typeAcceptance A brief description of the sampleAB PG 58-34 M #5 Test, #3(851370), #4(851371), No Test
The quantity of what the sample constitutes1 can From where was the sample collectedSource
First name of sampler or witnessed byDerell Last name of sampler or witnessed byHarper
Title of samplerConsultant Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility namevalero benicia Transportation Laboratory (TL) Number851372
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAsphalt Binder Performance GradePG 58-34 M
ModifiedYes Lot number
Sublot number Tank numberNot set
Time of sampleNot set HMA SupplierNot set
Certified Asphalt SupplierNot set MultigradeNot set
Multigrade TypeNot set Asphalt Binder Mix NumberNot set

Test Details

DIME Sample ID: 2020-09-25-23
DIME Test ID: 2020-09-25-23-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2020-10-12

Test Results


Is mass change based on one or two containers?: One
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 10/12/2020
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 179.432 grams
Mass of container #1 before test (m1i): 215.060 grams
Mass of container #1 after test (m1f): 214.767 grams
Average mass change: -0.822 percent
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/12/2020

Warning: The test results shown on this page have been superseded and are invalid. This information is for reference only.