Summary for Test 2020-05-08-31-1
Test performed: AASHTO T30-19Project Information
Project Identifiers | Project ID: 66667 DEA: JMFPP EFIS: 0019000043 |
---|---|
DIST-CO-RTE-PM | 59--- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Special project for submitting Sample information for JMF Prequalification Program. |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Sample Information
Sample Taken Date | 05/08/2020 | Sample Unique Key | 31 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 04/20/2020 |
Sample type | Quality Control | A brief description of the sample | T308 - 2 |
The quantity of what the sample constitutes | 2 Bags of RAP | From where was the sample collected | Source |
First name of sampler or witnessed by | Jordan | Last name of sampler or witnessed by | Baker |
Title of sampler | Telephone number of sampler | 5302270982 | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Deer Creek Rock and Asphalt | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | Deer Creek Rock and Asphalt |
---|---|---|---|
Aggregate Size | Aggregate Source | ||
RAP Stockpile | Stockpile Size (tons) | ||
Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2020-05-08-31
DIME Test ID: 2020-05-08-31-1
Testing Lab: Jaxon Enterprises - Deer Creek Rock & Asphalt
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2020-10-06
Test Results
Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: CGI Technician
Date of test: 05/08/2020
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 99 %
Cumulative percent passing the 3/8 in. sieve: 98 %
Cumulative percent passing the #4 sieve: 84 %
Cumulative percent passing the #8 sieve: 74 %
Cumulative percent passing the #16 sieve: 68 %
Cumulative percent passing the #30 sieve: 47 %
Cumulative percent passing the #50 sieve: 29 %
Cumulative percent passing the #100 sieve: 18 %
Cumulative percent passing the #200 sieve: 10.1 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/6/2020 ✔