Summary for Test 2020-09-17-20-1
Test performed: AASHTO T30-19Project Information
Project Identifiers | Project ID: 214629 DEA: 051H9304 EFIS: 0517000017 |
---|---|
DIST-CO-RTE-PM | 05-SLO-46-R17.2/R17.6 |
Award Date | 04/07/2020 |
Closeout Date | 10/20/2022 |
Work Description | CONSTRUCT ROUNDABOUT. |
Location Description | SAN LUIS OBISPO COUNTY NEAR TEMPLETON FROM 0.2 MILE WEST TO 0.2 MILE EAST OF VINEYARD DRIVE |
QA Service Level | 1 (Verified on 02/20/2020) |
Sample Information
Sample Taken Date | 09/17/2020 | Sample Unique Key | 20 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/25/2020 |
Sample type | Verification | A brief description of the sample | Bag of RAP |
The quantity of what the sample constitutes | One JMF Verification | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Larry | Last name of sampler or witnessed by | Scott |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | CalPortland Paso Robles | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | CalPortland Paso Robles |
---|---|---|---|
Aggregate Size | Aggregate Source | ||
RAP Stockpile | Stockpile Size (tons) | ||
Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2020-09-17-20
DIME Test ID: 2020-09-17-20-1
Testing Lab: CT D05 - San Luis Obispo District Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2020-10-01
Test Results
Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Daniel Gingras
Date of test: 09/28/2020
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 95.6 %
Cumulative percent passing the 3/8 in. sieve: 88.2 %
Cumulative percent passing the #4 sieve: 59.5 %
Cumulative percent passing the #8 sieve: 43.2 %
Cumulative percent passing the #16 sieve: 31.6 %
Cumulative percent passing the #30 sieve: 22.1 %
Cumulative percent passing the #50 sieve: 14.6 %
Cumulative percent passing the #100 sieve: 9.3 %
Cumulative percent passing the #200 sieve: 5.9 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/1/2020 ✔