Summary for Test 2020-07-27-26-10
Test performed: CTM 202-November 2011Project Information
Project Identifiers | Project ID: 214573 DEA: 073096U4 EFIS: 0719000091 |
---|---|
DIST-CO-RTE-PM | 07-LA-210-R0.0/R9.7 |
Award Date | 04/03/2020 |
Closeout Date | 06/06/2024 |
Work Description | PLACE CONCRETE PAVEMENT, BARRIER, HMA, DRAINAGE, AND ELECTRICAL. |
Location Description | LOS ANGELES COUNTY IN LOS ANGELES FROM INTERSTATE 5 TO WHEATLAND AVENUE UNDERCROSSING |
QA Service Level | 1 (Verified on 06/05/2020) |
Sample Information
Sample Taken Date | 07/27/2020 | Sample Unique Key | 26 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/11/2020 |
Sample type | Verification | A brief description of the sample | PSUE 3/4" HMA-A-SP R15 0.50% LAS |
The quantity of what the sample constitutes | 10 Bags Of Agg., 2 Bags Of Rap | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Vulcan Sun Valley | Last name of sampler or witnessed by | QC |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 0489A 20 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Vulcan Materials-Sun Valley | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-19-0017, 91-19-0019, 91-19-0021 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | 220831SVA LTR | A detailed description of where the material sample was collected | Belt Cut at Vulcan Sun Valley Plant |
Where the material sample would have been placed if not sampled | Asphalt Paving | Primary Aggregate Nominal Size | 3/4 inch |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2020-07-27-26
DIME Test ID: 2020-07-27-26-10
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2020-08-19
Test Results
What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Satish Jain, Sebastian Ferrer
Date of test: 08/17/2020
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 99 %
Cumulative percent passing the 1/2 in. sieve: 86 %
Cumulative percent passing the 3/8 in. sieve: 72 %
Cumulative percent passing the #4 sieve: 49 %
Cumulative percent passing the #8 sieve: 36 %
Cumulative percent passing the #16 sieve: 25 %
Cumulative percent passing the #30 sieve: 16 %
Cumulative percent passing the #50 sieve: 10 %
Cumulative percent passing the #100 sieve: 6 %
Cumulative percent passing the #200 sieve: 4 %
General comments (publicly viewable) (Max 1000 characters): Combined Aggregate/RAP Gradation w/Correlation Factors Applied
Test was verified on 8/19/2020 ✔