Summary for Test 2020-07-31-1-1
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 214355 DEA: 120K0214 EFIS: 1214000096 |
---|---|
DIST-CO-RTE-PM | 12-ORA-5-12.4/14.5 |
Award Date | 12/20/2019 |
Closeout Date | Not set |
Work Description | South County Improvement Project (Phase 1 - Avery/Crown Valley) PLACE HMA, INSTALL CONC PAVEMENT, RETAIN WALL, MODIFY ELECT SYS. | Add one lane btwn 73 & Oso PKWY |
Location Description | ORANGE COUNTY IN SAN JUAN CAPISTRANO, LAGUNA HILLS, LAGUNA NIGUEL AND MISSION VIEJO FROM 0.5 MILE SOUTH OF AVERY PARKWAY UNDERCROSSING TO 0.8 MILE NORTH OF CROWN VALLEY PARKWAY OVERCROSSING |
QA Service Level | 1 (Verified on 10/31/2019) |
Sample Information
Sample Taken Date | 07/31/2020 | Sample Unique Key | 1 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 08/04/2020 |
Sample type | Quality Assurance | A brief description of the sample | A706 Grade 60 Welded Hoops |
The quantity of what the sample constitutes | 4 | From where was the sample collected | Fabricator |
First name of sampler or witnessed by | Arthur | Last name of sampler or witnessed by | Peterson |
Title of sampler | QA Inspector | Telephone number of sampler | 707-342-8602 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | RKR Steel Welding | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | L110-171-20 | Structure unique identifier | |
Structure name |
Material Information
Material Type | SMTL TM5 - Welded Hoops | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Ultimate | Rebar Heat Number(s) | 1202019086 |
Hoop Manufacturer Lot Number(s) | Lot 1 | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Size | #6 |
Diameter of Hoop | 2'-6" | Epoxy Coated | No |
Epoxy Coating Color | NA | Rebar Manufacturer | Nucor Utah |
Welding Company | RKR Steel Welding | Coating Standards | Uncoated |
Weld Type | Flash Welded |
Test Details
DIME Sample ID: 2020-07-31-1
DIME Test ID: 2020-07-31-1-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Test Release Date: 2020-08-12
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: bewing
Date of test: 08/11/2020
UTM: 400kip
Temperature: 72 f
Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|
1 | 1 | 1 | 6/19mm | 0.44 | 43837.56 | 99631 | Ok Necking | bewing |
General comments (publicly viewable) (Max 1000 characters): Ok Necking
Test Graph
Source: Bluehill Data Point FileTest graph for the Sample
Test was verified on 8/12/2020 ✔