Summary for Test 2020-06-12-18-1
Test performed: AASHTO T30-19Project Information
Project Identifiers | Project ID: 214731 DEA: 051M0004 EFIS: 0519000047 |
---|---|
DIST-CO-RTE-PM | 05-SLO-101-16.5/R21.5 |
Award Date | 04/22/2020 |
Closeout Date | 08/23/2021 |
Work Description | COLD PLANE AND RHMA-GAP GRADED OVERLAY ON EXISTING ROADWAY. |
Location Description | SAN LUIS OBISPO COUNTY IN AND NEAR PISMO BEACH FROM 0.1 MILE SOUTH OF PRICE CANYON ROAD TO SAN LUIS CREEK BRIDGE |
QA Service Level | 1 (Verified on 05/29/2020) |
Sample Information
Sample Taken Date | 06/12/2020 | Sample Unique Key | 18 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/22/2020 |
Sample type | Verification | A brief description of the sample | Bag of RAP |
The quantity of what the sample constitutes | One JMF Verification | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Noah | Last name of sampler or witnessed by | Hunt |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | SPM Templeton | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | SPM Avenal |
---|---|---|---|
Aggregate Size | Unknown | Aggregate Source | Unknown |
RAP Stockpile | Stockpile Size (tons) | Unknown | |
Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2020-06-12-18
DIME Test ID: 2020-06-12-18-1
Testing Lab: CT D05 - San Luis Obispo District Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2020-07-08
Test Results
Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Daniel Gingras
Date of test: 06/23/2020
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 99.6 %
Cumulative percent passing the 3/8 in. sieve: 92.1 %
Cumulative percent passing the #4 sieve: 69.3 %
Cumulative percent passing the #8 sieve: 52.7 %
Cumulative percent passing the #16 sieve: 39.1 %
Cumulative percent passing the #30 sieve: 28.5 %
Cumulative percent passing the #50 sieve: 19.5 %
Cumulative percent passing the #100 sieve: 12.6 %
Cumulative percent passing the #200 sieve: 7.9 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/8/2020 ✔