Test 2020-07-02-3-1 (CTM 670-December 2013) Summary
Project Information
Project Identifiers | Project ID: 214176 DEA: 033F0904 EFIS: 0312000056 | ||
---|---|---|---|
DIST-CO-RTE-PM | 03-SAC,SJ-5,160-Var | ||
Work Description | REPLACE STRUCTURAL CONCRETE BRIDGES, PLACE CIDH & CISS CONCRETE PILES. | ||
Location Description | SACRAMENTO COUNTY AT NORTH SACRAMENTO UNDERCROSSING AND SACRAMENTO RIVER BRIDGE AND IN SAN JOAQUIN COUNTY AT MOKELUMNE RIVER BRIDGE |
Sample Information
Sample Taken Date | 7/2/2020 | Sample Unique Key | 3 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 7/6/2020 |
Sample type | Quality Assurance | A brief description of the sample | #11 Mechanical Couplers |
The quantity of what the sample constitutes | 150 | From where was the sample collected | Fabricator |
First name of sampler or witnessed by | Joe | Last name of sampler or witnessed by | Lanz |
Title of sampler | CT METS QA INSPECTOR | Laboratory sample identification | |
The fabricator/manufacturer/facility name | Camblin Steel Service | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | B31-025-20 | Structure unique identifier | |
Structure name |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Ultimate | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | CMC Steel Arizona |
Coupler Manufacturer | HRC | Intermediate Assembler or Fabricator | Camblin Steel Services Inc |
Rebar Size | #11 | Coupler Model | HRC 500/510 |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
Coupler Component Heat/Lot Number(s) | HRC 500 73116792 HRC 510 73117653 | Rebar Heat Number(s) | 4096075 |
Rebar Size 2 |
Test Details
DIME Sample ID: 2020-07-02-3
DIME Test ID: 2020-07-02-3-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Test Release Date: 2020-07-07
Test Results
Number of Samples: 4
Input Type: Measured
Tester's full name: Kleinfelder
Date of test: 07/06/2020
UTM: NA
Halo ID: NA
Temperature:73 f
Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|---|
1 | 1 | 3093841 | 11 | 1.56 | 0.027 | 146480 | 93867 | Pass | kleinfelder |
2 | 2 | 3093841 | 11 | 1.56 | 0.027 | 146410 | 93853 | Pass | kleinfelder |
3 | 3 | 3093841 | 11 | 1.56 | 0.027 | 146620 | 93987 | Pass | kleinfleder |
4 | 4 | 3093841 | 11 | 1.56 | 0.027 | 147600 | 94615 | Pass | kleinfelder |
General comments (publicly viewable) (Max 1000 characters): UTM used for testing was a Forney 600 kip; lab technician K. DeSouza.
Test was verified on 07/07/2020 ✔