Summary for Test 2020-06-08-37-3

Test performed: AASHTO T30-19

Project Information

Project IdentifiersProject ID: 213835
DEA: 051F7404
EFIS: 0514000049
DIST-CO-RTE-PM05-MON-101-R28.0/R30.6
Award Date04/03/2019
Closeout Date08/23/2021
Work DescriptionPLACE CONTINUOUSLY REINFORCED CONCRETE PAVEMENT ON EXISTING ROADWAY.
Location DescriptionMONTEREY COUNTY NEAR SAN LUCAS FROM 0.1 MILE SOUTH OF PARIS VALLEY ROAD OVERCROSSING TO RANCHO UNDERCROSSING
QA Service Level1 (Verified on 02/18/2019)

Sample Information

Sample Taken Date06/08/2020 Sample Unique Key37
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/19/2020
Sample typeVerification A brief description of the sampleBag of RAP
The quantity of what the sample constitutesOne JMF Renewal From where was the sample collectedJob Site
First name of sampler or witnessed byLarry Last name of sampler or witnessed byScott
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameSPM Templeton Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceTempleton
Aggregate SizeUnknown Aggregate SourceUnknown
RAP Stockpile Stockpile Size (tons)Unknown
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2020-06-08-37
DIME Test ID: 2020-06-08-37-3
Testing Lab: CT D05 - San Luis Obispo District Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2020-07-02

Test Results


Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Daniel Gingras
Date of test: 06/24/2020
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 99.1 %
Cumulative percent passing the 3/8 in. sieve: 91.8 %
Cumulative percent passing the #4 sieve: 62.3 %
Cumulative percent passing the #8 sieve: 45.3 %
Cumulative percent passing the #16 sieve: 34 %
Cumulative percent passing the #30 sieve: 26 %
Cumulative percent passing the #50 sieve: 18.9 %
Cumulative percent passing the #100 sieve: 12.6 %
Cumulative percent passing the #200 sieve: 7.3 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/2/2020