Summary for Test 2020-04-23-20-1

Test performed: AASHTO T30-19

Project Information

Project IdentifiersProject ID: 214591
DEA: 051M2704
EFIS: 0519000089
DIST-CO-RTE-PM05-SB-150-0.0/2.2
Award Date02/14/2020
Closeout Date08/23/2021
Work DescriptionRHMA OVERLAY, FULL WIDTH SEGMENT CORRECTION AND COLD PLANE AC.
Location DescriptionSANTA BARBARA COUNTY IN AND NEAR CARPINTERIA FROM ROUTE 101/150 SEPARATION TO VENTURA COUNTY LINE
QA Service Level1 (Verified on 05/29/2020)

Sample Information

Sample Taken Date04/23/2020 Sample Unique Key20
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/07/2020
Sample typeVerification A brief description of the samplebag of RAP
The quantity of what the sample constitutesOne JMF Verification From where was the sample collectedManufacturer
First name of sampler or witnessed byMark Last name of sampler or witnessed byBennet
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameVulcan Saticoy Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceVulcan Saticoy
Aggregate SizeUnknown Aggregate SourceUnknown
RAP Stockpile Stockpile Size (tons)Unknown
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2020-04-23-20
DIME Test ID: 2020-04-23-20-1
Testing Lab: CT D05 - San Luis Obispo District Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2020-05-22

Test Results


Does this test use 1/4 sieve?: Yes
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Daniel Gingras
Date of test: 05/07/2020
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 82.8 %
Cumulative percent passing the 3/8 in. sieve: 58.6 %
Cumulative percent passing the 1/4 in. sieve: 0 %
Cumulative percent passing the #4 sieve: 30.5 %
Cumulative percent passing the #8 sieve: 22.8 %
Cumulative percent passing the #16 sieve: 18.6 %
Cumulative percent passing the #30 sieve: 15 %
Cumulative percent passing the #50 sieve: 11.2 %
Cumulative percent passing the #100 sieve: 6.7 %
Cumulative percent passing the #200 sieve: 4.5 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 5/22/2020