Test 2020-05-15-4-5 (CTM 670-December 2013) Summary

The test has been saved successfully.
Project Information
Project IdentifiersProject ID: 212304
DEA: 021C7504
EFIS: 0200000080
DIST-CO-RTE-PM02-PLU-70-14.9
Work DescriptionCONCRETE BRIDGE, RETAINING WALLS, HMA, DRAINAGE AND GUARDRAIL.
Location DescriptionPLUMAS COUNTY NEAR BELDEN AT YELLOW CREEK BRIDGE 09-0008
Sample Information
Sample Taken Date5/15/2020 Sample Unique Key4
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing5/18/2020
Sample typeQuality Assurance A brief description of the sampleCouplers
The quantity of what the sample constitutes52 From where was the sample collectedFabricator
First name of sampler or witnessed byG Last name of sampler or witnessed byZimmerman
Title of sampler Laboratory sample identification
The fabricator/manufacturer/facility nameCamblin Steel Transportation Laboratory (TL) NumberC709427
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateService Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC
Coupler ManufacturerBarSplice Intermediate Assembler or FabricatorUnknown
Rebar Size#11 Coupler ModelGriptwist
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop DiameterUnknown Rebar Hoop FabricatorUnknown
Coupler Component Heat/Lot Number(s)A195823 Rebar Heat Number(s)4080596
Rebar Size 2
Test Details
DIME Sample ID: 2020-05-15-4
DIME Test ID: 2020-05-15-4-5
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2020-05-19
Test Results

Number of Samples Tested: 1
Input Type: Measured
Tester's full name: bewing
Date of test: 05/18/2020
UTM:2000kip
Temperature:72.00 f
Halo ID:
NumSampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
13No. 11/36mm101.5614672894056Service Splicebewing

General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.

Test was verified on 05/19/2020