Summary for Test 2020-04-28-1-2

Test performed: CTM 670-December 2013

Project Information

Project IdentifiersProject ID: 213764
DEA: 080F0304
EFIS: 0800020358
DIST-CO-RTE-PM08-SBD-60-R0.7/R3.0
Award Date03/07/2019
Closeout Date07/27/2023
Work DescriptionREMOVE AND REPLACE THREE OVERCROSSING BRIDGES ON ROUTE 60
Location DescriptionIN SAN BERNARDINO COUNTY IN AND NEAR CHINO AT VARIOUS LOCATIONS FROM O.1 MILE WEST OF PIPELINE AVENUE OVERCROSSING TO 0.1 MILE EAST OF BENSON AVENUE OVERCROSSING
QA Service Level1 (Verified on 05/01/2019)

Sample Information

Sample Taken Date04/28/2020 Sample Unique Key1
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/06/2020
Sample typeQuality Assurance A brief description of the sample#10 BarSplice GripTwist couplers
The quantity of what the sample constitutesunknown From where was the sample collectedJob Site
First name of sampler or witnessed byKenneth Last name of sampler or witnessed byVarela
Title of samplerAssociate Steel Inspector Telephone number of sampler562 440-7716
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameIntegrity Rebar Placers Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) FormL08-040-20 Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateService Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerGerdau
Coupler ManufacturerBarSplice Intermediate Assembler or FabricatorUnknown
Rebar Size#10 Coupler ModelGripTwist Taper Thread
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop DiameterUnknown Rebar Hoop FabricatorUnknown
Coupler Component Heat/Lot Number(s)A195234 / A190418 Rebar Heat Number(s)6502751702
Rebar Size 2 10 Coupler Unique IDNot set

Test Details

DIME Sample ID: 2020-04-28-1
DIME Test ID: 2020-04-28-1-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2020-05-08

Test Results


Number of Samples Tested: 1
Input Type: Measured
Tester's full name: fsaylor
Date of test: 05/07/2020
UTM: 2000kip
Temperature: 72.00 f
Halo ID:
NumSampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
12No. 10/32mm101.27129837102233OK Neckingfsaylor

General comments (publicly viewable) (Max 1000 characters): OK Necking
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.

Test was verified on 5/8/2020