Summary for Test 2014-10-05-1-2
Test performed: CTM 217-June 2011Project Information
Project Identifiers | Project ID: 7428 DEA: 07215944 EFIS: 0700001834 |
---|---|
DIST-CO-RTE-PM | 07-LA-5-4.0/5.9 |
Award Date | 08/23/2012 |
Closeout Date | 07/02/2021 |
Work Description | RECONSTRUCT AND WIDEN FREEWAY AND UNDERCROSSING STRUCTURES. |
Location Description | LOS ANGELES COUNTY IN NORWALK FROM 0.4 MILE SOUTH OF SAN ANTONIO DRIVE UNDERCROSSING TO 0.7 MILE NORTH OF PIONEER BOULEVARD UNDERCROSSING |
QA Service Level | 1 (Verified on 11/07/2012) |
Sample Information
Sample Taken Date | 10/05/2014 | Sample Unique Key | 1 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/07/2014 |
Sample type | Department Acceptance | A brief description of the sample | Soil for Structure Backfill |
The quantity of what the sample constitutes | Unknown | From where was the sample collected | Source |
First name of sampler or witnessed by | Mian | Last name of sampler or witnessed by | Ali |
Title of sampler | Assistant RE | Telephone number of sampler | Unknown |
Laboratory sample identification | 4281B | Linked DIME Sample ID | 0 |
The fabricator/manufacturer/facility name | 3rd St off from 710 Northbound | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
Structure name | Not set |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | Unknown |
---|---|---|---|
The fabricator/manufacturer designation for the sample | Unknown | A detailed description of where the material sample was collected | 3rd St off from 710 Northbound |
Where the material sample would have been placed if not sampled | Unknown |
Test Details
DIME Sample ID: 2014-10-05-1
DIME Test ID: 2014-10-05-1-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2015-02-20
Test Results
Number of tests: 1
Input Type: Calculated
Tester's full name: Danilo Ferrer
Date of test: 10/08/2014
Temperature correction: no data
Temperature of solution: no data
Clay reading (test 1): no data
Sand reading (test 1): no data
Sand equivalent (test 1): no data
Sand equivalent before temperature correction: no data
Sand equivalent after temperature correction: 21
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/20/2015 ✔