Summary for Test 2020-02-19-1-1

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 99999
DEA: 0322222
DIST-CO-RTE-PM03-SAC,OMG-888,99,80-0.6-0.6
Award DateNot set
Closeout DateNot set
Work DescriptionTHIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES.
Location DescriptionTHIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES.
QA Service Level (Verified on 04/05/2013)

Sample Information

Sample Taken Date02/19/2020 Sample Unique Key1
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing02/19/2020
Sample typeQuality Assurance A brief description of the sampleSkid testing raw data
The quantity of what the sample constitutes1 From where was the sample collectedJob Site
First name of sampler or witnessed byskidmore sampler Last name of sampler or witnessed byskidmore last name
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameskidmore fabricator Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypeNot set
Type of Traffic Control ProvidedNot set DIST-CO-RTENot set
Direction of TravelNot set Post MileNot set
Lanes to be TestedNot set StationNot set

Test Details

DIME Sample ID: 2020-02-19-1
DIME Test ID: 2020-02-19-1-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2020-02-27

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: John OMara
Date of test: 02/19/2020
Air Temperature: 50 F
Tire Pressure: 26 psi
Equipment PST #: 1000-7
Is Calibration within ± values: Yes
Weather: Sunny
Direction/Lane #: SB: Southbound Direction of Travel
Edge used to measure reference distance: no data
Edge used to measure position: Beginning of Bridge
Reference Distance 1: 100 ft ft
Reference Distance 2: 103 ft ft
Reference Distance 3: 106 ft ft
Direction and Lane # for Stationing 1: SB Lane
Direction and Lane # for Stationing 2: SB Lane
Direction and Lane # for Stationing 3: SB Lane
Position for Stationing 1: 17 ft
Position for Stationing 2: 17 ft
Position for Stationing 3: 17 ft
Percent Grade for 1st Stationing: 1.0 %
Percent Grade for 2nd Stationing: 1.0 %
Percent Grade for 3rd Stationing: 1.0 %
Corrected Coefficients of Friction for Stationing 1: 0.43
Corrected Coefficients of Friction for Stationing 2: 0.42
Corrected Coefficients of Friction for Stationing 3: 0.42
Average Coefficient of Friction: 0.42
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 2/27/2020