Summary for Test 2019-12-18-16-1

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 3825
DEA: 07138204
EFIS: 0700000142
DIST-CO-RTE-PM07-LA-47,103-3.5/4.6,0.0/1.1
Award Date06/30/2011
Closeout Date07/14/2022
Work DescriptionREPLACE STEEL BRIDGE WITH CIP PS CONCRETE BOX GIRDER BRIDGE AND RAMPS.
Location DescriptionLOS ANGELES COUNTY IN LONG BEACH AND LOS ANGELES ON ROUTE 47 FROM OCEAN BOULEVARD TO ROUTE 103 JUNCTION AND ON ROUTE 103 FROM ROUTE 47 JUNCTION TO ANAHEIM STREET OVERHEAD
QA Service Level1 (Verified on 03/29/2012)

Sample Information

Sample Taken Date12/18/2019 Sample Unique Key16
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/19/2019
Sample typeAcceptance A brief description of the sample1" X No. 4 PCC AGGREGATE
The quantity of what the sample constitutes1 bag From where was the sample collectedFabricator
First name of sampler or witnessed byHonesto Last name of sampler or witnessed byCastillo
Title of samplerMREA Telephone number of sampler
Laboratory sample identification8923 Linked DIME Sample ID2019-12-18-16
The fabricator/manufacturer/facility nameNational Ready Mix Artesia Transportation Laboratory (TL) NumberC915126
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)Unknown
The fabricator's/manufacturer's product name for the sampleUnknown The fabricator/manufacturer designation for the sampleUnknown
The plant numberUnknown A detailed description of where the material sample was collectedunknown
Where the material sample would have been placed if not sampledUnknown Primary Aggregate Nominal Size1 inch
The concrete mix design numberUnknown Lot numberUnknown
Sublot numberUnknown Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2019-12-18-16
DIME Test ID: 2019-12-18-16-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2020-03-17

Test Results


What size aggregate is being tested?: 1 in. x No. 4 - Coarse Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: D. MONTEMAYOR
Date of test: 12/23/2019
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 89 %
Cumulative percent passing the 3/4 in. sieve: 53 %
Cumulative percent passing the 1/2 in. sieve: 14 %
Cumulative percent passing the 3/8 in. sieve: 9 %
Cumulative percent passing the #4 sieve: 3 %
Cumulative percent passing the #8 sieve: 1.4 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 3/17/2020