Summary for Test 2019-11-15-42-1
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 210837 DEA: 080J0804 EFIS: 0800000283 COOP: 081625 |
---|---|
DIST-CO-RTE-PM | 08-RIV-15-34.7/51.6 |
Award Date | 04/17/2017 |
Closeout Date | Not set |
Work Description | (Alternative Delivery) DESIGN-BUILD OF THE INTERSTATE 15 EXPRESS LANES PROJECT |
Location Description | Riverside County and SBD-15-0.0/1.3 |
QA Service Level | 1 (Verified on 05/08/2017) |
Sample Information
Sample Taken Date | 11/15/2019 | Sample Unique Key | 42 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/24/2019 |
Sample type | Quality Assurance | A brief description of the sample | 08-0J0804 #5 Lenton Formsaver Coupler |
The quantity of what the sample constitutes | 4 | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Rigoberto | Last name of sampler or witnessed by | Marin |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Con Fab | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Authorization Testing |
---|---|---|---|
Service or Ultimate | Service | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | CMC Rebar |
Coupler Manufacturer | Erico Lenton | Intermediate Assembler or Fabricator | Unknown |
Rebar Size | 5 | Coupler Model | Lenton Form Saver |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Unknown | Rebar Hoop Fabricator | Unknown |
Coupler Component Heat/Lot Number(s) | L9499 | Rebar Heat Number(s) | 4088593 |
Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2019-11-15-42
DIME Test ID: 2019-11-15-42-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2019-12-27
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: bewing
Date of test: 12/24/2019
UTM: 400kip
Temperature: 72.00 f
Halo ID: Small
Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|---|---|
1 | 1 | No. 5/16mm | 1 | -0.0012 | 0.31 | 28515 | 91984 | Service Splice | bewing |
General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 12/27/2019 ✔