Summary for Test 2019-10-25-22-4

Test performed: AASHTO T30-15

Project Information

Project IdentifiersProject ID: 66667
DEA: JMFPP
EFIS: 0019000043
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for submitting Sample information for JMF Prequalification Program.
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date10/25/2019 Sample Unique Key22
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/01/2019
Sample typeVerification A brief description of the sampleRAP
The quantity of what the sample constitutesJMF Prequalification From where was the sample collectedManufacturer
First name of sampler or witnessed byCody Last name of sampler or witnessed byBrown
Title of sampler Telephone number of sampler
Laboratory sample identification19-263 Linked DIME Sample ID
The fabricator/manufacturer/facility nameSyar Indunsties Lake Herman Batch Transportation Laboratory (TL) Number911405
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceLake Herman Quarry
Aggregate SizeUnknown Aggregate SourceUnknown
RAP StockpileStatic Stockpile Size (tons)3200
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2019-10-25-22
DIME Test ID: 2019-10-25-22-4
Testing Lab: CT D01 - District 1 Materials Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2019-12-04

Test Results


Input Type: Calculated
Tester's full name: Leif Ayres
Date of test: 12/04/2019
Cumulative percent passing the 2 in. sieve: no data
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 99.9 %
Cumulative percent passing the 1/4 in. sieve: 83.2 %
Cumulative percent passing the #4 sieve: 83.2 %
Cumulative percent passing the #8 sieve: 61.2 %
Cumulative percent passing the #16 sieve: 44.4 %
Cumulative percent passing the #30 sieve: 33.6 %
Cumulative percent passing the #50 sieve: 23.9 %
Cumulative percent passing the #100 sieve: 15.9 %
Cumulative percent passing the #200 sieve: 11 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/4/2019