Summary for Test 2019-10-02-31-4

Test performed: CTM 203-February 2008

Project Information

Project IdentifiersProject ID: 214337
DEA: 080E33U4
EFIS: 0817000075
DIST-CO-RTE-PM08-SBD-115-R7.3/R10.0
Award Date04/26/2021
Closeout DateNot set
Work DescriptionADD WB AUX & EB DECEL LANES, WIDEN I15 SW CONNECT,RAMPS/BRDG
Location DescriptionSAN BERNARDINO COUNTY IN ONTARIO FROM 0.2 MILE WEST OF CUCAMONGA CREEK BRIDGE TO MILLIKEN AVENUE
QA Service Level1 (Verified on 06/23/2021)

Sample Information

Sample Taken Date10/02/2019 Sample Unique Key31
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/09/2019
Sample typePer Request A brief description of the sampleSoil
The quantity of what the sample constitutes1 bag From where was the sample collectedJob Site
First name of sampler or witnessed byShadi Last name of sampler or witnessed byDweab
Title of samplerTE Telephone number of sampler657-328-6367
Laboratory sample identification8758 Linked DIME Sample ID
The fabricator/manufacturer/facility nameCaltrans Transportation Laboratory (TL) NumberC-7303-2
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleUnknown
The fabricator/manufacturer designation for the sampleUnknown A detailed description of where the material sample was collectedRte 60 PM R7.4 - R9.9, A-19-001, Sample No. S-7
Where the material sample would have been placed if not sampledUnknown

Test Details

DIME Sample ID: 2019-10-02-31
DIME Test ID: 2019-10-02-31-4
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 203-February 2008: Mechanical Analysis of Soils
Test Release Date: 2019-10-16

Test Results


What size aggregate is being tested?: Fine Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Input Type: Calculated
Tester's full name: Tess Perez
Date of test: 10/14/2019
Cumulative percent passing the 3/8 in. sieve: 98 %
Cumulative percent passing the #4 sieve: 92 %
Cumulative percent passing the #8 sieve: 84 %
Cumulative percent passing the #16 sieve: 70 %
Cumulative percent passing the #30 sieve: 52 %
Cumulative percent passing the #50 sieve: 33 %
Cumulative percent passing the #100 sieve: 20 %
Cumulative percent passing the #200 sieve: 14 %
General comments (publicly viewable) (Max 1000 characters): Material in Suspension: 1 hr 9.1%, 24 hrs 5.5%, Combined % in Suspension 1 hr 8%, 24 hrs 5%

Test was verified on 10/16/2019