Summary for Test 2014-07-30-5304336-2

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 7428
DEA: 07215944
EFIS: 0700001834
DIST-CO-RTE-PM07-LA-5-4.0/5.9
Award Date08/23/2012
Closeout Date07/02/2021
Work DescriptionRECONSTRUCT AND WIDEN FREEWAY AND UNDERCROSSING STRUCTURES.
Location DescriptionLOS ANGELES COUNTY IN NORWALK FROM 0.4 MILE SOUTH OF SAN ANTONIO DRIVE UNDERCROSSING TO 0.7 MILE NORTH OF PIONEER BOULEVARD UNDERCROSSING
QA Service Level1 (Verified on 11/07/2012)

Sample Information

Sample Taken Date07/30/2014 Sample Unique Key5304336
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/30/2014
Sample typeAcceptance A brief description of the sampleClass 2 Aggregate Base
The quantity of what the sample constitutes2 Bags From where was the sample collectedSource
First name of sampler or witnessed byMalik Last name of sampler or witnessed byAli
Title of samplerAssistant RE Telephone number of sampler
Laboratory sample identification4207B Linked DIME Sample IDNot set
The fabricator/manufacturer/facility name5 NB Offramp to Norwalk Blvd Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)Unknown
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collected5 NB Offramp to Norwalk Blvd
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size
The concrete mix design number Lot numberNot set
Sublot numberNot set Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2014-07-30-5304336
DIME Test ID: 2014-07-30-5304336-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2015-02-20

Test Results


Number of tests: 1
Input Type: Calculated
Tester's full name: Nader Rashidi
Date of test: 08/04/2014
Temperature correction: no data
Temperature of solution: no data
Clay reading (test 1): no data
Sand reading (test 1): no data
Sand equivalent (test 1): no data
Sand equivalent before temperature correction: no data
Sand equivalent after temperature correction: 52
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 2/20/2015