Summary for Test 2019-02-28-11-2

Test performed: CTM 202-November 2011

Project Information

Project Identifiers
DEA: No Project
DIST-CO-RTE-PM---
Award DateNot set
Closeout Date11/01/2022
Work DescriptionSpecial project identifier for material not associated with a project
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date02/28/2019 Sample Unique Key11
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing02/28/2019
Sample typePreliminary A brief description of the sampleRAP
The quantity of what the sample constitutesJMF From where was the sample collectedSource
First name of sampler or witnessed byCarlos Last name of sampler or witnessed byManzo
Title of samplerQC Technician Telephone number of sampler
Laboratory sample identificationTEM12SPLA Linked DIME Sample ID
The fabricator/manufacturer/facility nameSPM-Templeton Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceStockpile
Aggregate SizeUnknown Aggregate SourceUnknown
RAP Stockpile Stockpile Size (tons)Unknown
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2019-02-28-11
DIME Test ID: 2019-02-28-11-2
Testing Lab: Sierra Pacific Materials
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2019-07-30

Test Results


What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: unknown
Date of test: 02/28/2019
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 98.7 %
Cumulative percent passing the 3/8 in. sieve: 94.4 %
Cumulative percent passing the #4 sieve: 71.4 %
Cumulative percent passing the #8 sieve: 52.1 %
Cumulative percent passing the #16 sieve: 39.7 %
Cumulative percent passing the #30 sieve: 30.7 %
Cumulative percent passing the #50 sieve: 21.2 %
Cumulative percent passing the #100 sieve: 13.6 %
Cumulative percent passing the #200 sieve: 8.6 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/30/2019