Summary for Test 2014-08-04-8640-3

Test performed: ASTM C231-10

Project Information

Project IdentifiersProject ID: 7780
DEA: 112T1824
EFIS: 1100020051
DIST-CO-RTE-PM11-SD-805-4.7/5.6
Award Date01/03/2013
Closeout Date09/07/2018
Work DescriptionREPLACE STRUCTURE AND CONSTRUCT DIRECT ACCESS RAMP (DAR).
Location DescriptionSAN DIEGO COUNTY IN CHULA VISTA FROM 0.4 MILE SOUTH OF EAST PALOMAR STREET OVERCROSSING TO 0.1 MILE NORTH OF NAPLES STREET UNDERCROSSING
QA Service Level1 (Verified on 12/10/2012)

Sample Information

Sample Taken Date08/04/2014 Sample Unique Key8640
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testingNot set
Sample typeQuality Control A brief description of the sample6x12 concrete cylinders
The quantity of what the sample constitutes5 cylinders From where was the sample collectedSource
First name of sampler or witnessed bySarah Last name of sampler or witnessed byThomson
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID2014
The fabricator/manufacturer/facility nameVulcan Mission Valley Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier201408040740
Structure name

Material Information

Material TypeConcrete The concrete mix design number103612F
The truck number from where the sample was collected447 The batch plant ticket number from where the sample was collected123797
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collected66R Wall Where the material sample would have been placed if not sampledNot set
From Lot No.Not set Bag Lot No.Not set

Test Details

DIME Sample ID: 2014-08-04-8640
DIME Test ID: 2014-08-04-8640-3
Testing Lab: Vulcan Materials Company - San Diego
Test Method: ASTM C231-10: Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2014-08-11

Test Results


Is wet sieving required?: No
Input Type: Measured
Tester's full name: Sarah Thomson
Date of test: 08/04/2014
Apparent air content: 1.5 %
Aggregate correction factor: 1
Air content: 0.5 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/11/2014