Summary for Test 2019-06-13-13-1
Test performed: AASHTO T308-10Project Information
Project Identifiers | Project ID: 212911 DEA: 081F9404 EFIS: 0815000067 |
---|---|
DIST-CO-RTE-PM | 08-RIV-79-R4.7/R10.6 |
Award Date | 05/22/2018 |
Closeout Date | 06/23/2021 |
Work Description | COLD PLANE, OVERLAY WITH RUBBERIZED HOT MIX ASPHALT (TYPE G) |
Location Description | RIVERSIDE COUNTY FROM 0.1 MILE SOUTH OF MURRIETA HOT SPRINGS ROAD TO 0.1MILE NORTH OF ABELIA ROAD |
QA Service Level | 1 (Verified on 12/28/2018) |
Sample Information
Sample Taken Date | 06/13/2019 | Sample Unique Key | 13 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/14/2019 |
Sample type | Department Acceptance | A brief description of the sample | 3/4" RHMA-G PG64-16RB 0.5% LAS |
The quantity of what the sample constitutes | 4 boxes | From where was the sample collected | Source |
First name of sampler or witnessed by | QC | Last name of sampler or witnessed by | QC |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 0349G-19 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | AAA-Corona | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
---|---|---|---|
HMA Grading | 3/4 inch | Lot number | Unknown |
Sublot number | Unknown | HMA Mix Number | Not set |
Combined Gradation Report Information
Combined Gradation Report Id | Bin Index | Dime Test Id |
---|---|---|
No assigned tests for this sample. |
Test Details
DIME Sample ID: 2019-06-13-13
DIME Test ID: 2019-06-13-13-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2019-07-11
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Angelito Villegas
Date of test: 06/18/2019
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 7.70 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/11/2019 ✔