Summary for Test 2014-07-26-5452934-1

Test performed: ASTM C138-10b

Project Information

Project IdentifiersProject ID: 209175
DEA: 030F2204
EFIS: 0300000072
DIST-CO-RTE-PM03-ED-50-R30.7/R31.7
Award Date02/25/2014
Closeout Date07/30/2015
Work DescriptionREPLACE BRIDGE.
Location DescriptionSLY PARK UNDERCROSSING
QA Service Level1 (Verified on 11/01/2013)

Sample Information

Sample Taken Date07/26/2014 Sample Unique Key5452934
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/26/2014
Sample typeQuality Control A brief description of the sampleApproach Slab 2 Concrete
The quantity of what the sample constitutes1 bag From where was the sample collectedSource
First name of sampler or witnessed byAndrew Last name of sampler or witnessed bySantos
Title of samplerNot set Telephone number of samplerNot set
Laboratory sample identificationNot set Linked DIME Sample IDNot set
The fabricator/manufacturer/facility nameFolsom Ready Mix Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeConcrete The concrete mix design numberSF718AFST0
The truck number from where the sample was collectedNot set The batch plant ticket number from where the sample was collected1046921
Concrete batch plantNot set The fabricator/manufacturer designation for the sampleNot set
A detailed description of where the material sample was collectedFolsom Ready Mix Stockpile Where the material sample would have been placed if not sampledNot set
From Lot No.Not set Bag Lot No.Not set

Test Details

DIME Sample ID: 2014-07-26-5452934
DIME Test ID: 2014-07-26-5452934-1
Testing Lab: Viking Construction Company, Incorporated - Rancho Cordova
Test Method: ASTM C138-10b: Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete
Test Release Date: 2014-07-31

Test Results


Input Type: Calculated
Tester's full name: Andrew Santos
Date of test: 07/26/2014
Identification of concrete represented by the sample: Approach Slab 2 Concrete
Volume of the measure: 4.008 ft^3
Density of concrete: 142.8 lb/ft^3
Yield of concrete: no data
Relative yield of the batch: no data
Cement content: no data
Air content: no data
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/31/2014