Summary for Test 2019-04-16-39-4

Test performed: CTM 203-February 2008

Project Information

Project IdentifiersProject ID: 214151
DEA: 080R0104
EFIS: 0812000007
DIST-CO-RTE-PM08-RIV--
Award DateNot set
Closeout DateNot set
Work DescriptionNot set
Location DescriptionNot set
QA Service Level1 (Verified on 05/09/2019)

Sample Information

Sample Taken Date04/16/2019 Sample Unique Key39
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/18/2019
Sample typePer Request A brief description of the sampleSoil
The quantity of what the sample constitutes1 Ziplock bag From where was the sample collectedJob Site
First name of sampler or witnessed byMichael Last name of sampler or witnessed byLiao
Title of samplerTE Telephone number of sampler
Laboratory sample identification8556 Linked DIME Sample ID2019-04-16-38
The fabricator/manufacturer/facility nameCaltrans Transportation Laboratory (TL) NumberNone
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleUnknown
The fabricator/manufacturer designation for the sampleUnknown A detailed description of where the material sample was collectedA-19-01 Sample number S1
Where the material sample would have been placed if not sampledUnknown

Test Details

DIME Sample ID: 2019-04-16-39
DIME Test ID: 2019-04-16-39-4
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 203-February 2008: Mechanical Analysis of Soils
Test Release Date: 2019-06-06

Test Results


What size aggregate is being tested?: Fine Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Input Type: Calculated
Tester's full name: Danny Ferrer
Date of test: 04/26/2019
Cumulative percent passing the 3/8 in. sieve: 60 %
Cumulative percent passing the #4 sieve: 45 %
Cumulative percent passing the #8 sieve: 34 %
Cumulative percent passing the #16 sieve: 27 %
Cumulative percent passing the #30 sieve: 22 %
Cumulative percent passing the #50 sieve: 18 %
Cumulative percent passing the #100 sieve: 15 %
Cumulative percent passing the #200 sieve: 13 %
General comments (publicly viewable) (Max 1000 characters): Hydrometer Results: 1 Hour 4%, 24 hours 1%

Test was verified on 5/30/2019