Summary for Test 2019-04-23-6-1
Test performed: AASHTO T308-10
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
Project Information
Project Identifiers | Project ID: 212645 DEA: 080N9714 EFIS: 0815000101 |
---|---|
DIST-CO-RTE-PM | 08-SBD-395-39.0/45.9 |
Award Date | 11/07/2017 |
Closeout Date | 12/12/2019 |
Work Description | WIDEN EXISTING SHOULDERS TO 8' AND CONSTRUCT 4' MEDIAN BUFFER |
Location Description | SAN BERNARDINO COUNTY NEAR ADELANTO FROM 2.2 MILES NORTH OF KRAMER ROAD TO ROUTE 58 |
QA Service Level | 1 (Verified on 04/04/2018) |
Sample Information
Sample Taken Date | 04/23/2019 | Sample Unique Key | 6 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/23/2019 |
Sample type | Department Acceptance | A brief description of the sample | 1/2" HMA-A R15 PG 64-28M (1.0% Lime Slurry) |
The quantity of what the sample constitutes | 147.95 tons out | From where was the sample collected | Source |
First name of sampler or witnessed by | Kevin | Last name of sampler or witnessed by | Oluoha |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 0245A-19 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Blue Diamond Victorville | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
Structure name | Not set |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 1/2 inch | Lot number | 1 |
Sublot number | 10 | HMA Mix Number | Not set |
Test Details
DIME Sample ID: 2019-04-23-6
DIME Test ID: 2019-04-23-6-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2019-05-02
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Angelito Villegas
Date of test: 04/25/2019
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 4.72 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/2/2019 ✔
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.