Summary for Test 2019-04-24-20-1
Test performed: AASHTO T30-15Project Information
Project Identifiers | Project ID: 66667 DEA: JMFPP EFIS: 0019000043 |
---|---|
DIST-CO-RTE-PM | 59--- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Special project for submitting Sample information for JMF Prequalification Program. |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Sample Information
Sample Taken Date | 04/24/2019 | Sample Unique Key | 20 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/24/2019 |
Sample type | Quality Control | A brief description of the sample | Combined RAP |
The quantity of what the sample constitutes | 24 boxes | From where was the sample collected | Source |
First name of sampler or witnessed by | Escobar | Last name of sampler or witnessed by | Escobar |
Title of sampler | QC Operations Supervisor | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Granite Construction Company | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
Structure name | Not set |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | Granite Construction |
---|---|---|---|
Aggregate Size | Unknown | Aggregate Source | Unknown |
RAP Stockpile | Stockpile Size (tons) | Unknown | |
Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2019-04-24-20
DIME Test ID: 2019-04-24-20-1
Testing Lab: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2019-05-06
Test Results
Input Type: Calculated
Tester's full name: GARCO Testing Laboratories
Date of test: 02/11/2019
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the 1/4 in. sieve: 100 %
Cumulative percent passing the #4 sieve: 75 %
Cumulative percent passing the #8 sieve: 48 %
Cumulative percent passing the #16 sieve: 33 %
Cumulative percent passing the #30 sieve: 24 %
Cumulative percent passing the #50 sieve: 17 %
Cumulative percent passing the #100 sieve: 11 %
Cumulative percent passing the #200 sieve: 8 %
General comments (publicly viewable) (Max 1000 characters): AASHTO T 30 RAP Gradation Sample 1
Test was verified on 4/29/2019 ✔