Summary for Test 2019-03-25-19-8
Test performed: CTM 211-May 2010Project Information
Project Identifiers | Project ID: 213738 DEA: 07303504 EFIS: 0714000007 |
---|---|
DIST-CO-RTE-PM | 07-VEN-23-0.0/R3.3 |
Award Date | 01/09/2019 |
Closeout Date | 11/02/2020 |
Work Description | COLD PLANE & OVERLAY ASPHALT CONCRETE PAVEMENT AND UPGRADE CURB RAMPS. |
Location Description | VENTURA COUNTY IN THOUSAND OAKS FROM CARLISLE ROAD TO ROUTE 101 |
QA Service Level | 1 (Verified on 11/02/2020) |
Sample Information
Sample Taken Date | 03/25/2019 | Sample Unique Key | 19 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/02/2019 |
Sample type | Annual Source Testing | A brief description of the sample | 3/8" PCC Gravels |
The quantity of what the sample constitutes | 4 Bags | From where was the sample collected | Source |
First name of sampler or witnessed by | Harrison | Last name of sampler or witnessed by | Kain |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Cemex Moorpark | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
Structure name | Not set |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-56-0014::MOORPARK |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
The plant number | Unknown | A detailed description of where the material sample was collected | Stockpile @ Plant |
Where the material sample would have been placed if not sampled | Unknown | Primary Aggregate Nominal Size | 3/8 inch |
The concrete mix design number | Unknown | Lot number | Unknown |
Sublot number | Unknown | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2019-03-25-19
DIME Test ID: 2019-03-25-19-8
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 211-May 2010: Abrasion of Coarse Aggregate by Use of the Los Angeles Abrasion Testing Machine
Test Release Date: 2019-04-30
Test Results
How many revolutions are required?: 500 Revolution Test
Input Type: Calculated
Tester's full name: Danny Ferrer
Date of test: 04/11/2019
Grading: C
Percent wear: 24 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/23/2019 ✔