Summary for Test 2019-04-10-13-1
Test performed: AASHTO T308-10Project Information
Project Identifiers | Project ID: 209695 DEA: 08347704 EFIS: 0800000616 |
---|---|
DIST-CO-RTE-PM | 08-SBD-SR-58-0/12.9 |
Award Date | 11/10/2017 |
Closeout Date | 01/14/2021 |
Work Description | (Alternative Delivery) The CMGC project will upgrade SR 58 from 2- to 4-lanes in San Bernardino County from the Kern County line to 7.5 miles east of US-395. |
Location Description | SR-58 / 395 Kramer Junction project. In San Bernardino County from the Kern County line to 7.5 miles east of US-395. |
QA Service Level | 1 (Verified on 12/01/2017) |
Sample Information
Sample Taken Date | 04/10/2019 | Sample Unique Key | 13 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/11/2019 |
Sample type | Department Acceptance | A brief description of the sample | 1/2" HMA-A R15 PG 64-28M (1.0% Lime Slurry) |
The quantity of what the sample constitutes | 54.02 tons out | From where was the sample collected | Source |
First name of sampler or witnessed by | qc | Last name of sampler or witnessed by | qc |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 0223A-19 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Vulcan-Oro Grande | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
Structure name | Not set |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 1/2 inch | Lot number | Unknown |
Sublot number | Unknown | HMA Mix Number | Not set |
Test Details
DIME Sample ID: 2019-04-10-13
DIME Test ID: 2019-04-10-13-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2019-04-19
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Gerardo Cordero
Date of test: 04/12/2019
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 4.39 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/12/2019 ✔