Summary for Test 2019-01-04-69-1

Test performed: AASHTO T30-15

Project Information

Project IdentifiersProject ID: 66667
DEA: JMFPP
EFIS: 0019000043
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for submitting Sample information for JMF Prequalification Program.
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date01/04/2019 Sample Unique Key69
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing01/04/2019
Sample typeQuality Control A brief description of the sample3/4 HMA Type A
The quantity of what the sample constitutesJMF From where was the sample collectedSource
First name of sampler or witnessed byCarlos Last name of sampler or witnessed byManzo
Title of samplerQC Technician Telephone number of sampler805-440-7390
Laboratory sample identificationTEM34SPLA Linked DIME Sample ID
The fabricator/manufacturer/facility nameSPM-Avenal Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceStockpile
Aggregate Size Aggregate Source
RAP Stockpile Stockpile Size (tons)
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2019-01-04-69
DIME Test ID: 2019-01-04-69-1
Testing Lab: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2019-04-19

Test Results


Input Type: Calculated
Tester's full name: Gurpartap Grewal
Date of test: 01/04/2019
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 97 %
Cumulative percent passing the 3/8 in. sieve: 89 %
Cumulative percent passing the 1/4 in. sieve: 89 %
Cumulative percent passing the #4 sieve: 68 %
Cumulative percent passing the #8 sieve: 55 %
Cumulative percent passing the #16 sieve: 42 %
Cumulative percent passing the #30 sieve: 27 %
Cumulative percent passing the #50 sieve: 15 %
Cumulative percent passing the #100 sieve: 9 %
Cumulative percent passing the #200 sieve: 9 %
General comments (publicly viewable) (Max 1000 characters): RAP Sample 3A T-30

Test was verified on 4/12/2019