Summary for Test 2019-03-16-5-1
Test performed: AASHTO T30-15Project Information
Project Identifiers | Project ID: 212889 DEA: 073009U4 EFIS: 0714000238 |
---|---|
DIST-CO-RTE-PM | 07-LA-110-R0.7/24.1 |
Award Date | 04/03/2018 |
Closeout Date | 06/30/2021 |
Work Description | REPLACE CONCRETE PAVEMENT, COLD PLANE AND PLACE HMA PAVEMENT. |
Location Description | LOS ANGELES COUNTY IN AND NEAR LOS ANGELES AND CARSON FROM GAFFEY STREET TO 0.1 MILE SOUTH OF COLLEGE STREET OVERCROSSING |
QA Service Level | 1 (Verified on 06/21/2018) |
Sample Information
Sample Taken Date | 03/16/2019 | Sample Unique Key | 5 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/25/2019 |
Sample type | Verification | A brief description of the sample | RAP |
The quantity of what the sample constitutes | 1 bag | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | G | Last name of sampler or witnessed by | Zubieta |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | All American Asphalt-Irwindale | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
Structure name | Not set |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | Unknown |
---|---|---|---|
Aggregate Size | Unknown | Aggregate Source | Unknown |
RAP Stockpile | Stockpile Size (tons) | Unknown | |
Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2019-03-16-5
DIME Test ID: 2019-03-16-5-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2019-04-08
Test Results
Input Type: Calculated
Tester's full name: Satish Jain
Date of test: 03/29/2019
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 97 %
Cumulative percent passing the 3/8 in. sieve: 88 %
Cumulative percent passing the 1/4 in. sieve: no data
Cumulative percent passing the #4 sieve: 60.2 %
Cumulative percent passing the #8 sieve: 43 %
Cumulative percent passing the #16 sieve: 33 %
Cumulative percent passing the #30 sieve: 25 %
Cumulative percent passing the #50 sieve: 17 %
Cumulative percent passing the #100 sieve: 11 %
Cumulative percent passing the #200 sieve: 7.3 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/8/2019 ✔