Summary for Test 2019-02-01-9-1
Test performed: AASHTO T30-15Project Information
Project Identifiers | Project ID: 9999 DEA: 00000000 EFIS: 0000000000 COOP: 99999333399 MINOR: 333333 Permit Numbers: 555555 0400NRT0000 |
---|---|
DIST-CO-RTE-PM | 03-SAC,OMG-888,99,80-0.6-0.6 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | THIS PROJECT RECORD WAS ADDED FOR DIME DEVELOPERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
Location Description | THIS PROJECT RECORD WAS ADDED FOR DIME DEVELOPERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
QA Service Level | 1 (Verified on 04/05/2013) |
Sample Information
Sample Taken Date | 02/01/2019 | Sample Unique Key | 9 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | Not set |
Sample type | Quality Control | A brief description of the sample | 1 |
The quantity of what the sample constitutes | 1 | From where was the sample collected | Source |
First name of sampler or witnessed by | 2 | Last name of sampler or witnessed by | 2 |
Title of sampler | 2 | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | 1 | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
Structure name | Not set |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | 1111 |
---|---|---|---|
Aggregate Size | Aggregate Source | ||
RAP Stockpile | Stockpile Size (tons) | ||
Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2019-02-01-9
DIME Test ID: 2019-02-01-9-1
Testing Lab: Thinh Org
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2019-02-14
Test Results
Input Type: Calculated
Tester's full name: Thinh Nguyen123
Date of test: 02/01/2019
Cumulative percent passing the 2 in. sieve: no data
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 98 %
Cumulative percent passing the 3/8 in. sieve: 89 %
Cumulative percent passing the 1/4 in. sieve: no data
Cumulative percent passing the #4 sieve: 69 %
Cumulative percent passing the #8 sieve: 54 %
Cumulative percent passing the #16 sieve: 41 %
Cumulative percent passing the #30 sieve: 29 %
Cumulative percent passing the #50 sieve: 19 %
Cumulative percent passing the #100 sieve: 13 %
Cumulative percent passing the #200 sieve: 8.8 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/14/2019 ✔