Summary for Test 2019-01-09-4-3
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 213062 DEA: 07292304 EFIS: 0712000109 |
---|---|
DIST-CO-RTE-PM | 07-LA-5-25.6/26.0 |
Award Date | 04/04/2018 |
Closeout Date | 06/08/2020 |
Work Description | WIDEN OFF-RAMP, WIDEN BRIDGE, AND CONSTRUCT CONCRETE BARRIER. |
Location Description | LOS ANGELES COUNTY IN LOS ANGELES FROM 0.1 MILE SOUTH TO 0.2 MILE NORTH OF ROUTE 5S/5 SEPARATION |
QA Service Level | 1 (Verified on 04/18/2018) |
Sample Information
Sample Taken Date | 01/09/2019 | Sample Unique Key | 4 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/08/2019 |
Sample type | Quality Assurance | A brief description of the sample | Double Barrel Zap Screwlok |
The quantity of what the sample constitutes | 4 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | David | Last name of sampler or witnessed by | Bonon |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | BarSplice CMC | Transportation Laboratory (TL) Number | C866888 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | NA | Structure unique identifier | Not set |
Structure name | Not set |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Service | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | CMC |
Coupler Manufacturer | BarSplice | Intermediate Assembler or Fabricator | Unknown |
Rebar Size | 5 | Coupler Model | DB ZP Screwlok Trans cp |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Unknown | Rebar Hoop Fabricator | Unknown |
Coupler Component Heat/Lot Number(s) | 8026 | Rebar Heat Number(s) | 4082429 4082469 |
Rebar Size 2 | 6 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2019-01-09-4
DIME Test ID: 2019-01-09-4-3
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Test Release Date: 2019-02-15
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: Brian
Date of test: 02/08/2019
UTM: 400KIP
Temperature: 72 F
Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|
1 | 3 | 1 | #5/16mm | 0.31 | 29840 | 96260 | Bar Broke | Brian |
General comments (publicly viewable) (Max 1000 characters): Bar Broke; OK Necking
Test Graph
Source: Partner Data Point FileTest graph for the Sample
Test was verified on 2/8/2019 ✔